Chiller & AHU installation in Jazan, Jazan Region
Chiller and AHU installation in Jazan starts with calculating the large cooling load on the hot, humid Red Sea coast. We fabricate and install vibration-isolated bases, insulated chilled-water pipework and duct connections, then test the full system before handover.
4.9 on Google- Vibration isolation
- Aluminium cladding
- Full commissioning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When you need this installation
- 1
A new commercial or government building
The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.
- 2
An existing unit vibrates and makes noise
Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.
- 3
Extending an existing building
Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.
Who it's for
Building a hospital or hotel that needs a central cooling plant
We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.
Ask on WhatsAppReplaced an old chiller but connections do not match
We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.
Ask on WhatsApp
What the job covers
What the installation covers
- Chiller lifted onto isolated base
- Chilled pipework run and insulated
- Aluminium cladding of pipework
- AHUs mounted and duct-connected
- Pressure test and commissioning
How we work
How we work
- 1
Site survey and design
We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.
- 2
Base preparation and lifting
We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.
- 3
Pipework and ductwork
We run the chilled water pipes, insulate them and clad them in aluminium sheet to keep the insulation effective according to the building's conditions and its city's climate, then connect each AHU to its duct network.
- 4
Pressure test and commissioning
We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.
Why Alrabih?
Considered installation or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Chiller base | Isolators matched to the site | Bolted straight to concrete |
| Pipe insulation | Full insulation with aluminium cladding | Partial or left bare |
| Pipe test | Pressure test before start-up | Started without testing |
| Air balancing | Measured and dampers adjusted | Unbalanced airflow |
| Transition pieces | Fabricated in our own workshop | Improvised or ill-fitting |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we have completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewWhere we work
Chiller & AHU installation in cities near Jazan
We are based in Jeddah, and we supply duct and install across the Kingdom. All our services in Jazan
What sets this city apart
Jazan's buildings include multi-storey residential towers, hotels, port and industrial facilities across the hot, humid Red Sea coast. Very high humidity and salt air increase the cooling load and demand special protection for metals and pipework. The available roofs and plant rooms in these buildings allow efficient chiller and AHU placement after a site survey and lifting assessment.
Jazan is a port city on the southern Red Sea coastal plain, hot and humid throughout most of the year, built of apartment towers, hotels, port and industrial facilities and government buildings.
A common setup in large Jazan buildings is an air-cooled chiller on the roof with air handling units in a plant room, fed by duct to all floors.
The AC setup in Jazan
- 1
Air-cooled chiller on the roof
The chiller sits on a vibration-isolated base on the building roof, needing space for condenser airflow and a heavy-duty electrical supply.
- 2
Insulated and clad pipework
Chilled water pipes from chiller to plant room are heavily insulated and clad in aluminium to protect against humidity and salt air.
- 3
Air handling units in a plant room
AHUs sit in a dedicated plant room, connected to duct branches serving all floors, with space for maintenance and cleaning access.
Before the visit
Before our visit in Jazan
- 1
Send mechanical and electrical drawings
Share the drawings before the visit so we can determine cooling loads and available space for the chiller and plant room.
- 2
Confirm roof access and lifting capability
Agree on roof access and confirm lifting equipment available to position the heavy chiller and AHU units.
- 3
Arrange plant room location and power supply
Tell us the plant room location, size and proximity to the main electrical entry, so we can design pipework and connections efficiently.
Other services in Jazan
FAQ
Questions about Chiller & AHU installation
How is the chiller unit lifted to the roof?
The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.
Why do chilled water pipes need aluminium cladding?
Chilled water pipes carry cold water through air conditions that vary according to the building's own environment and its city's climate. Without external protection, insulation deteriorates and loses effectiveness. Aluminium cladding shields the insulation on rooftops and in internal spaces, preserving its performance over time.
Can you connect AHUs to an existing duct network?
Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.
What does system commissioning involve?
After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.
What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?
A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.
Do you install chillers and AHUs in large buildings in Jazan?
Yes. We install chillers, AHUs, insulated pipework and connected duct in hotels, apartment buildings, and industrial and government facilities in Jazan, then commission the entire system before handover.
How do materials and equipment reach the building site in Jazan?
We supply materials and equipment from our base in Jeddah to your site in Jazan, and agree with you on delivery and installation dates in the quote, with prior coordination of site access and unloading area.
How do high humidity and salt air affect the chiller and pipework in Jazan?
Humidity and salt air accelerate corrosion on metals and joints, so we choose the chiller, unit and pipework types and fixing methods suited to these conditions after site survey, and apply additional insulation and protection where the setup demands it.
How does the chiller on the roof connect to AHUs in the plant room?
Chilled water pipework runs from the roof-mounted chiller to the plant room, insulated and clad in aluminium, connecting to the inlet and outlet of each AHU. We test water pressure, temperature and flow balance before handover.