Copper piping works in Al Rawabi, Jeddah

In Al Rawabi, south Jeddah, where modern residential compounds and large villas are spread across multi-storey layouts, copper piping runs for central AC require careful planning to distribute indoor units across several floors. Alrabih's team ensures proper thermal insulation, pressure testing and vacuum conditions before refrigerant charging.

4.9 on Google
  • Full insulation
  • Dual test
  • Secure supports

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When you need a professional copper run

  1. 1

    A new project or system expansion

    A new central or split system needs a copper run sized to match the unit's capacity and the distance between the two sides. A run that is laid wrong from the start weakens performance and strains the compressor over time.

  2. 2

    A long distance between the units

    In commercial and industrial buildings the run can cross ceilings, walls and service voids. We supply copper runs of up to 30 metres without welded joints, and the site survey determines the route and the number of joints needed.

  3. 3

    An old line with a recurring leak

    If inspection shows the existing pipe is corroded or its joints cannot hold pressure again, a full re-run is safer than repeated patching. Jeddah's salty, humid air accelerates corrosion in copper that is not properly insulated.

Who it's for

  • Installing a new split system in your villa

    We lay the copper in the right diameter for each unit, insulate it immediately and run a pressure and vacuum test before charging.

    Ask on WhatsApp
  • Running a commercial building on a central system

    We run copper lines through ceilings and service voids, with control wiring, drain pipe and full pressure and vacuum tests.

    Ask on WhatsApp

What the job covers

What the work covers

  • Copper pipe in required diameter
  • Armaflex or Kimmco insulation
  • Supports, bends and sleeves
  • Control and power wiring
  • Pressure test and vacuum
Request a quote

How we work

How we work

  1. 1

    Route survey

    We visit the site, agree the route from the indoor to the outdoor unit with you, confirm the pipe diameter and mark every fixing point and obstacle along the way.

  2. 2

    Lay, insulate and support

    We lay the pipes along the agreed route, insulate them immediately to prevent moisture and condensation, and fix them to supports spaced to stop any sagging.

  3. 3

    Wires and drain pipe

    We run the control and power wires alongside the copper in a tidy arrangement that makes future servicing straightforward, and we fit the condensate drain pipe with a fall that carries water clear of the indoor unit.

  4. 4

    Pressure test and vacuum

    We pressurise the line to find any joint leak before charging, then vacuum it to remove air and moisture with a vacuum pump. Once the reading holds, the line is ready for refrigerant, with a one-year warranty.

Start with step one

Why Alrabih?

A thorough run or a quick one?

AlrabihThe usual way
InsulationFull, fitted immediatelyPartial or left for later
SupportsEvenly spacedToo few or missing
Pressure testAlways before chargingSometimes skipped
VacuumPump with reading heldNeglected in many cases
Control wiringLaid with the copper, tidyLeft to a later stage
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

The compounds in Al Rawabi contain villas and residential towers of varying heights, so copper runs need long paths from the central outdoor unit to the indoor units on each floor. The coastal humidity and salty air require robust thermal insulation and corrosion-treated supports, with the pipes split across different diameters to match each building section's cooling load.

Al Rawabi lies in south Jeddah, a district of modern residential towers and villa compounds with varied heights and open layouts.

Most villas and blocks here use one or two outdoor units serving multiple indoor units through complex copper networks.

The AC setup in Al Rawabi

  1. 1

    Copper network from outdoor to indoor units

    In the large villas and blocks of Al Rawabi, copper runs from the outdoor unit to several indoor units on different floors through insulated pipes.

  2. 2

    Protection sleeves at wall crossings

    The runs cross both exterior and interior walls, so we use protective sleeves to keep the copper and insulation safe from mechanical damage.

  3. 3

    Fixed supports on roofs and walls

    Long runs require fixed supports on roofs and interior walls to keep the installation stable and distribute the weight safely.

Before the visit

Before our visit in Al Rawabi

  1. 1

    Map out routing with the owner

    Before the visit, confirm with the owner that the planned copper routes through the building, roof and walls are acceptable.

  2. 2

    Prepare access to the outdoor unit

    Ensure our team can safely access the roof or location where the outdoor unit will be mounted to begin the installation.

  3. 3

    Have system details and required diameters ready

    Prepare information about the number of indoor units and diameters needed for each branch so we bring the correct pipes and insulation.

FAQ

Questions about Copper piping works

How does pipe diameter differ between a split and a central system?

The diameter depends on the system's capacity and the distance between the units, not on the system type alone. A central system serving a whole building needs larger diameters than a split for a single room. The survey and the unit datasheet set the right size; the wrong choice weakens performance or raises electricity consumption.

Why is the pipe insulated right after laying and not at the end of the job?

In Jeddah's humid air, condensation forms on the cold pipe surface as soon as the system runs. If the copper is left bare during installation, moisture gets between the pipe and the insulation and reduces its performance. Insulating immediately prevents this and protects the copper surface from early oxidation.

Can you run the copper inside finished walls or ceilings?

Yes, in suspended ceilings or service voids where access allows. Inside a finished concrete wall access is limited and may need extra building work. The survey identifies the practical route, and where concealment is not possible we use protective sleeves on the surface.

Why does the condensate drain matter in a copper piping job?

The indoor unit produces steady condensate, especially in Jeddah where humidity is high. Without enough fall in the drain pipe, or if it is routed in a way that blocks flow, water backs up in the tray and spills onto the ceiling or wall. We run it with a proper fall and separately from the other pipes.

How does Jeddah's humidity affect the insulation on copper pipe?

Jeddah's high humidity degrades pipe insulation quickly when the material is not vapour-resistant or when joints are left unsealed. We use Armaflex or Kimmco materials suited to a coastal climate and seal every joint carefully so that moisture cannot reach the cold copper surface and start early corrosion.

How do you handle long copper runs in large villas?

We divide the runs into appropriate diameters for each branch, pressure test and vacuum each section before operation, and secure them on suitable supports along safe routes through the building.

The outdoor unit is far from the indoor one, does this affect installation?

Long distances are typical in Al Rawabi, and we supply copper runs of up to 30 metres without welded joints according to your needs, sizing the diameters and insulation based on the run length and cooling load required.

The salty coastal air affects the copper, how do you protect it?

We use robust thermal insulation from Armaflex or Kimmco to shield the copper from salty air, paired with corrosion-treated supports and protective sleeves where necessary.

How do you ensure the copper lines are safe before start-up?

We perform full pressure and vacuum testing on all runs before refrigerant goes in, to confirm there are no leaks or insulation damage.

The Jeddah corniche in cool weather

Start with a route survey

WhatsApp us a photo of the site and the system type, or call us, and we will arrange the survey in your district, Saturday to Thursday.

CallWhatsApp