Copper piping works in Al Rawasi, Jeddah
In Al Rawasi, east Jeddah, copper piping for central AC connects outdoor and indoor units in mixed residential projects. Alrabih pressure-tests and vacuums each line before refrigerant charging.
4.9 on Google- Full insulation
- Dual test
- Secure supports
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When you need a professional copper run
- 1
A new project or system expansion
A new central or split system needs a copper run sized to match the unit's capacity and the distance between the two sides. A run that is laid wrong from the start weakens performance and strains the compressor over time.
- 2
A long distance between the units
In commercial and industrial buildings the run can cross ceilings, walls and service voids. We supply copper runs of up to 30 metres without welded joints, and the site survey determines the route and the number of joints needed.
- 3
An old line with a recurring leak
If inspection shows the existing pipe is corroded or its joints cannot hold pressure again, a full re-run is safer than repeated patching. Jeddah's salty, humid air accelerates corrosion in copper that is not properly insulated.
Who it's for
Installing a new split system in your villa
We lay the copper in the right diameter for each unit, insulate it immediately and run a pressure and vacuum test before charging.
Ask on WhatsAppRunning a commercial building on a central system
We run copper lines through ceilings and service voids, with control wiring, drain pipe and full pressure and vacuum tests.
Ask on WhatsApp
What the job covers
What the work covers
- Copper pipe in required diameter
- Armaflex or Kimmco insulation
- Supports, bends and sleeves
- Control and power wiring
- Pressure test and vacuum
How we work
How we work
- 1
Route survey
We visit the site, agree the route from the indoor to the outdoor unit with you, confirm the pipe diameter and mark every fixing point and obstacle along the way.
- 2
Lay, insulate and support
We lay the pipes along the agreed route, insulate them immediately to prevent moisture and condensation, and fix them to supports spaced to stop any sagging.
- 3
Wires and drain pipe
We run the control and power wires alongside the copper in a tidy arrangement that makes future servicing straightforward, and we fit the condensate drain pipe with a fall that carries water clear of the indoor unit.
- 4
Pressure test and vacuum
We pressurise the line to find any joint leak before charging, then vacuum it to remove air and moisture with a vacuum pump. Once the reading holds, the line is ready for refrigerant, with a one-year warranty.
Why Alrabih?
A thorough run or a quick one?
| Alrabih | The usual way | |
|---|---|---|
| Insulation | Full, fitted immediately | Partial or left for later |
| Supports | Evenly spaced | Too few or missing |
| Pressure test | Always before charging | Sometimes skipped |
| Vacuum | Pump with reading held | Neglected in many cases |
| Control wiring | Laid with the copper, tidy | Left to a later stage |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Rawasi is a diversely developing residential area with medium villas, apartment blocks and mixed housing projects on varied plots. Copper runs here range from short to medium distances depending on outdoor and indoor unit placement. High coastal humidity and salt require strong heat insulation and robust supports and protection sleeves to ensure long-term safety and performance.
Al Rawasi sits in east Jeddah, a developing residential district of mixed villas, blocks and varied housing projects.
Mixed residential projects here distribute units in varied ways, and changing distances require careful planning of copper runs.
The AC setup in Al Rawasi
- 1
Varied distances in mixed villas and blocks
The varied villas and blocks here need copper runs in different lengths depending on how units are distributed in each project.
- 2
Supports and protection on exposed areas and walls
Pipes passing on exterior walls or exposed areas need firm supports and protection sleeves against weather.
- 3
Thorough testing and vacuum before operation
Every copper line is pressure-tested and efficiently vacuumed before refrigerant entry to ensure system cleanliness.
Before the visit
Before our visit in Al Rawasi
- 1
Get project plan and unit locations
Request from the manager a project plan showing outdoor unit and indoor evaporator locations and basic distances.
- 2
Agree the route and exposed points
Coordinate with the team on the path copper will take and which points are exposed and need protection.
- 3
Set up safe point for test equipment
Prepare a safe open area near the outdoor units for setting up pressure and vacuum testing equipment.
More districts for Copper piping works
Other services in Al Rawasi
FAQ
Questions about Copper piping works
How does pipe diameter differ between a split and a central system?
The diameter depends on the system's capacity and the distance between the units, not on the system type alone. A central system serving a whole building needs larger diameters than a split for a single room. The survey and the unit datasheet set the right size; the wrong choice weakens performance or raises electricity consumption.
Why is the pipe insulated right after laying and not at the end of the job?
In Jeddah's humid air, condensation forms on the cold pipe surface as soon as the system runs. If the copper is left bare during installation, moisture gets between the pipe and the insulation and reduces its performance. Insulating immediately prevents this and protects the copper surface from early oxidation.
Can you run the copper inside finished walls or ceilings?
Yes, in suspended ceilings or service voids where access allows. Inside a finished concrete wall access is limited and may need extra building work. The survey identifies the practical route, and where concealment is not possible we use protective sleeves on the surface.
Why does the condensate drain matter in a copper piping job?
The indoor unit produces steady condensate, especially in Jeddah where humidity is high. Without enough fall in the drain pipe, or if it is routed in a way that blocks flow, water backs up in the tray and spills onto the ceiling or wall. We run it with a proper fall and separately from the other pipes.
How does Jeddah's humidity affect the insulation on copper pipe?
Jeddah's high humidity degrades pipe insulation quickly when the material is not vapour-resistant or when joints are left unsealed. We use Armaflex or Kimmco materials suited to a coastal climate and seal every joint carefully so that moisture cannot reach the cold copper surface and start early corrosion.
Mixed projects have varied designs, how do you determine copper pipe diameters and lengths?
We assess each project on site to determine unit locations, distances and heat load, then select appropriate pipe diameters and lengths.
Streets and entrances are fairly close, how does the team access installation areas?
We coordinate with the site manager on the nearest parking and best access route to reach outdoor and indoor units safely and efficiently.
Salt and humidity are high here, does the insulation protect against coastal effects?
Yes, the heat insulation for copper protects the pipes from salt and humidity, and we pressure-test each line to confirm it is sound.
Do you vacuum every line before charging the refrigerant?
Yes, we vacuum every line with a quality pump before charging to ensure the system is completely clean and free of moisture and gases.


























































































