HVAC electro-mechanical

Electro-mechanical works in Bani Malik

In Bani Malik, central Jeddah, electro-mechanical work for AC ties the power panel, piping, fans and pumps into one working system. Alrabih designs the wiring and controls, coordinating with the main contractor to ensure every part is ready at handover.

  • Power panels
  • Control automation
  • Site coordination

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When these works are needed

  1. 1

    A new central HVAC project

    In commercial, government and industrial buildings, fitting units and ducts is not enough. You need electrical runs sized for the loads, a control panel that starts and stops equipment in the right order, and pumps and pipework designed for the building.

  2. 2

    Extending an existing HVAC system

    Adding units or new control zones means extra load on the panel and new control cabling. We review the available capacity on site and define what the extension needs before any work starts.

  3. 3

    Electrical faults stopping the equipment

    A unit that will not start despite being in good order, a pump that burns out repeatedly, breakers tripping for no clear reason: these are usually a wiring or panel problem, not a fault in the equipment, and need diagnosis from a technician who understands both sides.

Who it's for

  • Building a new commercial or government project

    We review drawings with the main contractor and take on power panels, electrical runs, control automation, pumps and ventilation from start to handover.

    Ask on WhatsApp
  • Your HVAC equipment keeps breaking down

    We diagnose the electrical and mechanical side of the system and identify whether the fault is in the panel, the wiring or the control circuits before any work begins.

    Ask on WhatsApp

What the works cover

  • Power panels and load distribution
  • Electrical runs for HVAC
  • Automation and control circuits
  • Pumps and pipework installation
  • Ventilation and exhaust fans
Request a quote

How we work

How we work

  1. 1

    Review project drawings

    We go through the electrical and mechanical drawings with the designer or main contractor and define the power requirements and cable routes before any materials are prepared.

  2. 2

    Site coordination

    Electro-mechanical works cross paths with civil works and finishes. We follow the site programme and agree the sequence with other contractors so no trade is held up by a clash.

  3. 3

    Run cables and fit equipment

    We pull cables, mount panels, pumps and ventilation fans, then wire the control and automation circuits according to the approved site drawings.

  4. 4

    Coordinated testing and start-up

    We test each circuit individually then run the full system together with the AC equipment, checking that automation starts and stops everything in the right order before handover.

Planned coordination or clashes that delay the project?

AlrabihThe usual way
Electrical panelSized for the actual loadRough sizing causes problems later
Control wiringDocumented to drawingsRun without documentation
Site coordinationFollowed with every tradeEach trade works in isolation
Start-up testFull test before handoverFaults found after handover
Change documentationRecorded at handoverVerbal changes, no record

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Bani Malik is a relatively modern residential district with mid-rise apartment blocks and mid-sized commercial projects, where electro-mechanical work demands tight coordination because trades often run in parallel with the building shell. Central units, pumps and fans need precise electrical connections and matched electronic controls, which means our team must sync with electricians, plumbers and other contractors on the same schedule.

Bani Malik sits in central Jeddah, a district of modern apartment blocks and mid-sized commercial projects with a wide main road.

Most projects here need a central unit rather than separate splits, which means a dedicated control panel and robust power runs.

The AC setup in Bani Malik

  1. 1

    Centralised control panel for the project

    Most residential and commercial projects in Bani Malik need a unified panel controlling the central unit, pumps and fans together.

  2. 2

    Heavy-duty power runs and safety documentation

    Wiring and circuits must be fully documented and comply with safety standards for new builds.

  3. 3

    Automated linking between units and electronic control

    Connections between unit, pump and fan need electronic programming to operate in perfect step.

Before the visit

Before our visit in Bani Malik

  1. 1

    Obtain the engineer's schematic and electrical drawings

    Before the visit, make sure the project's electrical and mechanical drawings are available so our team can plan precisely.

  2. 2

    Confirm the location of the power panel and outdoor units

    Tell us where the main panel, outdoor units and pumps will sit so we can assess the run lengths and actual costs.

  3. 3

    Arrange the handover schedule with the main contractor

    Set with us the date our work starts so we can sync with electricians, plumbers and other contractors on site.

FAQ

Questions about Electro-mechanical works

Can you handle the electro-mechanical works when there is already another civil contractor on site?

Yes. We work as a specialist subcontractor alongside the main contractor, coordinating cable routes, pipework and equipment positions with the other trades on site. Before work begins, we identify where our scope crosses the civil and structural work and agree on the sequence of installation to avoid clashes.

What is the difference between the power circuit and the control circuit in an HVAC project?

The power circuit carries current from the panel to the compressor, motor or fan; cable size is set by the load. The control circuit carries low-voltage signals between sensors, thermostats and the controller; it issues run, stop and modulation commands. A fault in either circuit disables the whole system, so each is routed and terminated independently.

Does your work include connecting the automation system to a building management network?

Yes, when a building management network is already present on site. We connect the HVAC control units to the designated interface points and test signal exchange between the two sides. Protocol details and configuration are agreed with the team responsible for the building management network before installation begins.

How do you handle a clash between cable routes and ducts or pipework?

We identify clashes at the planning stage before installation starts, then consult the relevant trades to agree on an alternative route. If a site resolution is not possible, the clash is escalated to the project supervisor for a decision. Priority is always given to keeping the correct bending radius for cables and the required fall on condensate drain pipes, as compromising either affects system performance.

How do you handle a clash between cable routes and ducts or pipework?

Clashes between cable routes, ducts and pipework are common on medium and large projects. We identify them during the drawing review stage, before any trenching or pulling begins, and agree an alternative route with the trades involved. Changing a route on paper is far simpler than reworking it on site.

How do you handle power connections in a new project?

We design the control panel and wire each unit, pump and fan to the engineer's drawings, then test every connection before final start-up.

Do you coordinate with the main contractor and other trades?

Yes, we agree on the handover schedule and ensure our team works in sync with electricians, plumbers and other contractors.

The central unit needs heavy power, how do you size the panel correctly?

We calculate the electrical load for each device and coordinate with the electrical contractor for a dedicated circuit of sufficient capacity to the control panel.

Does pump and fan installation need special consideration in Bani Malik?

We assess each pump and fan location to the project layout and ensure the mechanical and electrical connections are isolated to avoid vibration and noise transmission.

The Jeddah corniche in cool weather

Start with a drawing review

Send us the project drawings or get in touch to set a time for a requirements review, Saturday to Thursday.

CallWhatsApp