Government building HVAC in Al Salmiyah Al Sharqiyah, Jeddah

In Al Salmiyah Al Sharqiyah, south Jeddah, government buildings rely on documented central AC systems that allow work to continue during maintenance and modification. Alrabih's team follows the engineer's drawings and specifications, coordinating with the project supervisor to keep staff in their posts.

4.9 on Google
  • To the drawings
  • No work-hour stops
  • Regular maintenance

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When a government building needs our team

  1. 1

    A new project with consultant specs

    You have drawings, a bill of quantities and technical specifications from the consultant, and need a contractor who builds to them without improvising outside the contract. We match every item in the spec document before handover.

  2. 2

    Expansion or upgrade beside working staff

    Offices are in daily use and you need new ductwork or unit replacements. We work out a schedule with the supervisor that keeps noise and dust away from the working areas throughout office hours.

  3. 3

    An existing facility needing a maintenance contract

    The building is occupied and the HVAC needs regular care to stay effective in Jeddah's heat and salty air. We offer preventive and corrective maintenance contracts for government facilities, whether newly installed or already in service.

Who it's for

  • Overseeing HVAC installation in a new government building

    We review the consultant's drawings with you, coordinate with the site supervisor, and build to every item in the specification document.

    Ask on WhatsApp
  • Your occupied building needs a regular maintenance contract

    We provide preventive and corrective maintenance contracts that keep the HVAC performing in Jeddah's heat and salty air.

    Ask on WhatsApp

What the job covers

What the work covers

  • G90 galvanised ductwork
  • dampers and plenum boxes
  • flexible duct and outlets
  • Armaflex-insulated copper pipework
  • start-up and maintenance contracts
Request a quote

How we work

How we work

  1. 1

    Review drawings and quantities

    We receive the consultant's drawings and bill of quantities, review them with our technical team and flag any conflict between the drawing and the site before work starts.

  2. 2

    Schedule around office hours

    We agree the work phases and timing with the project supervisor; noisy or access-blocking tasks are done outside official office hours so occupied areas are not disrupted.

  3. 3

    Installation and testing

    We fabricate ductwork in our workshop then install, insulate and test air balance on site, checking every thermostat and damper performs as the specification requires.

  4. 4

    Start-up and handover

    We start the system up and confirm it runs as designed, and brief the building's operations team on its controls before we leave the site.

Start with step one

Why Alrabih?

Built to spec or built by guesswork?

AlrabihThe usual way
DrawingsEvery item matched before handoverSite changes by guesswork
Office hoursDisruptive work outside hoursConstant disruption to staff
HandoverFull start-up before we leaveHandover without a full start-up
After-carePreventive and corrective contractContact only when it breaks
Duct fabricationOur workshop, exact spec dimensionsOff-shelf stock may not match
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Salmiyah Al Sharqiyah buildings are relatively modern and spread across large plots with wide access roads, making it easy to move equipment and materials from the parking area to the work floor. Central systems here often serve multiple wings, with ductwork and plenum boxes distributed across separate roofs and plant rooms. Coastal humidity and intense summer heat increase the importance of testing joints and the condenser before final handover.

Al Salmiyah Al Sharqiyah is in the south, a district of modern spread-out buildings, wide roads and large service facilities.

Most government buildings here run steady, robust electrical circuits for the outdoor units and central fans without interruption.

The AC setup in Al Salmiyah Al Sharqiyah

  1. 1

    Multi-wing central air system

    The large government buildings here need one system serving multiple wings with separate plenum boxes and dampers for each wing.

  2. 2

    Separate rooftop plant rooms

    Outdoor units and central fans sit on separate roofs away from work areas to reduce noise and vibration.

  3. 3

    Vacuum and joint testing before handover

    Every system goes through complete joint, pipe and condenser testing before handover to ensure no leaks in the humid coastal environment.

Before the visit

Before our visit in Al Salmiyah Al Sharqiyah

  1. 1

    Obtain the engineer's drawings and specifications

    Before the team visits, confirm you have an up-to-date copy of the engineer's drawings and technical specs and know the project supervisors' names.

  2. 2

    Arrange access to the roofs and plant rooms

    Check that safe ladders are available and access permits exist for the roofs and plant rooms where the outdoor units and main joints will be.

  3. 3

    Coordinate visit timing with staff and supervisors

    Agree on a time that does not disrupt staff working hours, and brief the project supervisors and security about the team's timing one day ahead.

FAQ

Questions about Government building HVAC

How do you handle gaps between the drawings and the actual site?

Before installation we visit the site and compare it against the drawings. Any conflict is put to the supervisor or consultant for a formal direction before we proceed. We do not alter the design on our own initiative, as that affects air balance and the work of other contractors on the project.

Do you fabricate the ductwork yourselves or buy it ready-made?

We make both round and rectangular duct in our own workshop from G90 galvanized sheet to SMACNA standards, or from aluminium sheet when the specification calls for it. This lets us control the dimensions and thickness listed in the bill of quantities without depending on off-the-shelf stock that may not match.

How do you keep office air quality acceptable during installation?

Dust from sheet cutting and wall penetrations builds up quickly in air-conditioned buildings. We seal off the work zone with temporary barriers, close the duct sections connected to it during cutting, and clean the inside of the installed ductwork before connecting it to the AC units and starting the system.

What happens when the installation is finished?

We start the system and check with the supervisor that every damper, thermostat and air outlet works as the specification requires, then show the building's operations team how to control it. After that we offer a preventive and corrective maintenance contract that keeps the system performing in Jeddah's heat and salty air.

Does HVAC installation in an occupied building differ from an empty one?

Yes, significantly. In an occupied building we divide the work into phases, isolate each work zone from neighbouring offices, and defer noisy or penetration work to outside office hours. The site determines the best sequence, and this is agreed with the project supervisor before work begins.

Do you work on central AC systems in government buildings?

Yes, we handle central AC systems in government buildings, follow the engineer's drawings precisely and obtain approvals from the project supervisor before installation and handover.

These buildings are large, how do you distribute the ductwork and plenum boxes?

We distribute ductwork and plenum boxes according to wing and office zone divisions, using flexible ducts where designs permit to ease future maintenance.

Heat and coastal humidity affect the condenser, what tests must be done?

We test water and oil pressure in the condenser and check all joints and pipes for leaks before final handover.

How do you hand over documents and drawings after installation is complete?

We deliver a complete file including as-built drawings, performance tests and the first maintenance date, all before the team leaves the site.

The Jeddah corniche in cool weather

Start with a drawing review

Send the project drawings or call us to arrange a site visit. We give you a technical assessment before any work begins, Saturday to Thursday.

CallWhatsApp