Medical facility HVAC

Hospital HVAC in Al Naeem

In Al Naeem, north Jeddah, hospitals and medical centres need precise and reliable cooling designs. Alrabih designs systems to match each centre's needs and medical services, conducts routine maintenance and ensures service continuity.

  • Per-department ventilation
  • Maintenance without shutdown
  • Survey-based design

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When you need a medical HVAC specialist

  1. 1

    Hospital or clinic under construction

    The right design starts before any duct is installed, because ventilation and filtration needs differ from the surgical suite to the waiting area. An early survey saves costly alterations after the building is finished.

  2. 2

    Departments reporting warm air or odours

    In an existing medical building, weak cooling in one department or odours crossing into an adjacent area signals an imbalance in the air distribution or extraction system. Finding the cause needs measurement, not guesswork.

  3. 3

    Maintenance contract for a running facility

    A hospital does not close for equipment servicing. We schedule preventive maintenance visits department by department, coordinated with facility management, and carry out repairs with the smallest possible effect on daily operations.

Who it's for

  • Building a new hospital or medical centre

    We survey the building early and design systems to each department's requirements before installation begins.

    Ask on WhatsApp
  • Your clinic has repeated cooling faults

    We inspect the existing systems, find the root cause of recurring faults, and repair them without stopping the clinic.

    Ask on WhatsApp

What the service covers

  • Building survey and requirements
  • Duct network and AHU design
  • Installation commissioning and testing
  • Preventive and corrective contracts
  • Maintenance without stopping departments
Request a quote

How we work

How we work

  1. 1

    Survey and requirements

    We visit the facility, map the heat loads and air requirements for each department, and agree the duct routes before any design work begins.

  2. 2

    Design and supply

    We design the duct network and fabricate it in our own workshop to SMACNA specifications, and supply units from our authorised brands: Carrier, YORK, General, Midea, Gree and Smart Gold.

  3. 3

    Phased coordinated installation

    In operating buildings we work with management to phase the installation so adjacent departments stay open, and control dust and noise away from patient areas.

  4. 4

    Commissioning and follow-up

    We commission the systems, measure airflow in each department, and adjust the dampers until the design requirements are met, then hand over the facility with a maintenance plan.

Survey-based design or an off-the-shelf solution?

AlrabihThe usual way
Design basisEach department surveyed separatelyOne solution for the whole building
Ventilation and extractTailored to each space's functionUnbalanced between departments
MaintenanceWithout closing departmentsFull work stoppage
DuctworkFabricated in-house to SMACNA specOff-the-shelf non-compliant ducts
Copper runsMueller, no welded jointsMany welded joints

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Naeem's buildings are modern and well-planned with reasonable spaces and even distribution of clinics and departments. Intense summer heat and moderate humidity demand strong, adequate cooling for all medical departments. Sensitive rooms and labs need high-efficiency filtration and independent temperature and humidity controls. Regular maintenance and periodic duct and filter cleaning ensure performance and reliability.

Al Naeem is in north Jeddah, a modern district with organised medical facilities and regular distribution.

Medical centres in Al Naeem rely on high-capacity central cooling with independent controls and advanced filtration.

The AC setup in Al Naeem

  1. 1

    High-capacity central cooling system

    Al Naeem's space and layout suit a powerful central system covering all departments with high efficiency.

  2. 2

    Independent control units for each department

    Each medical department gets a separate control unit for independent temperature and humidity adjustment according to the centre's medical needs.

  3. 3

    High-efficiency air filters

    Multi-stage HEPA or equivalent filters ensure high air quality and protection from contaminants across all departments.

Before the visit

Before our visit in Al Naeem

  1. 1

    Full survey of all medical centre departments

    We visit all departments, clinics and labs to understand layout and specific needs for each area before design begins.

  2. 2

    Identify temperature needs for each department

    Speaking with centre management and doctors about specific temperature and humidity needs for each department helps design a precise and suitable system.

  3. 3

    Inspect the site and outdoor spaces

    Assess available roofs and outdoor spaces for safe unit and condenser installation, identifying the best mounting locations.

FAQ

Questions about Hospital HVAC

How do ventilation needs differ across hospital departments?

Ventilation needs vary from one department to the next based on the activity in each area and the requirements set by the facility's designer and the site survey. Operating theatres need highly filtered, directionally controlled air, while patient rooms, corridors and administrative areas each carry different requirements. We build the duct network and select units from the facility's drawings and its specific requirements, not from general assumptions.

Can systems be maintained without stopping sensitive departments?

Yes, but it requires careful planning before the maintenance date. We agree with facility management on a schedule that names the section and the right time window, then isolate the target section using dampers and blanking plates without affecting adjacent departments. Corrective tasks such as replacing a capacitor or repairing a flare joint are carried out within the agreed time window.

What governs duct network design in a medical building?

Design is governed by the approved facility drawings and each department's requirements as defined by the site survey and the specialist designer. We fabricate ducts in our own workshop from G90 galvanised sheet to project dimensions, and use Kimmco and Armaflex insulation with Foster sealants to control leakage. Distribution and pressure in each section follow the specifications drawn for that department individually.

What governs duct network design in a medical building?

Design is governed by the approved facility drawings and each department's requirements as defined by the site survey and the specialist designer. We fabricate ducts in our own workshop from G90 galvanised sheet to project dimensions, and use Kimmco and Armaflex insulation with Foster sealants to control leakage. Distribution and pressure in each section follow the specifications drawn for that department individually.

Do you work with small clinics or only hospitals?

We work with medical facilities of all sizes, from a clinic in a residential district to a multi-storey medical complex. The size of the facility does not change the principle: the site survey is the starting point, and from it we determine unit types, duct dimensions and fresh-air requirements for each zone. Preventive and corrective maintenance contracts are available for clinics and hospitals alike.

Summer heat is very intense, what cooling capacity is needed?

We calculate cooling capacity based on department volumes and actual heat load, selecting powerful chillers that handle peak heat with a safe margin.

Different medical departments need different temperatures, how do you regulate them?

We design flexible distribution with separate control units in each department, allowing independent temperature and humidity adjustment for each medical area.

Are standard filters sufficient or do you need special filters?

Medical facilities need high-efficiency filters to control fine particles and contaminants, and we recommend HEPA or equivalent filters in sensitive departments.

How often do ducts and filters need cleaning and maintenance?

We recommend monthly filter checks and quarterly duct cleaning, though more frequent cleaning may be needed depending on dust load and outdoor air quality.

The Jeddah corniche in cool weather

Start with a survey of your medical facility

WhatsApp or call us to arrange a site survey. We serve all Jeddah districts Saturday to Thursday, eight in the morning to eight in the evening.

CallWhatsApp