HVAC controls and automation in Al Faisaliyah, Jeddah
In Al Faisaliyah, villa compounds and residential buildings with moderate space need smart control of central AC. Alrabih connects thermostats and dampers to each section of the central unit, so each part of the building gets its own temperature.
4.9 on Google- Zone control
- Accurate wiring
- Automatic operation
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
Who needs these systems?
- 1
Villa or office with multiple zones
Bedrooms, reception rooms and offices have different hours of use. When each thermostat controls one zone, an empty room does not cool while an occupied one goes without; the survey decides the number of zones and what wiring the building needs.
- 2
A facility too large to run by hand
In warehouses, government buildings and commercial complexes, one operator cannot follow every unit. We connect the plant to a central point where the operator sees the status of each zone and intervenes without walking the building.
- 3
A system that runs irregularly
A unit left running after a room is vacated, or one that never stops at peak hours, is usually a controls problem rather than a fault in the unit. We inspect the control circuit and build on it a system suited to how the building is used.
Who it's for
Living in a villa with areas on different schedules
We fit a thermostat for each zone and wire it to its unit so bedrooms run independently from the reception area.
Ask on WhatsAppManaging a large facility that is hard to monitor manually
We connect units to a central control point so the operator sees every zone's status without walking the building.
Ask on WhatsApp
What the job covers
What the work covers
- Site survey and zoning
- Control wiring beside ducts
- Thermostat in each zone
- Units linked to central point
- Automatic operation tested per zone
How we work
How we work
- 1
Survey the building
We agree with you on zone boundaries, thermostat positions and the cable route before any work starts; the survey sets the real requirements based on building size and unit types.
- 2
Run the control cables
We route control cables neatly beside the ductwork and copper piping, keeping them away from power cables to avoid signal interference.
- 3
Fit thermostats and connect
We fix each thermostat in its agreed position, wire it to its unit, connect all units to the central control point and verify every circuit before testing.
- 4
Start up and hand over
We start each zone separately and check that each thermostat responds correctly, then show you how to monitor and adjust the zones from the central control point.
Why Alrabih?
Automatic control or manual switches?
| Alrabih | The usual way | |
|---|---|---|
| On and off | Automatic by temperature | Manual switch |
| Zones | Each zone independent | Whole building together |
| Operator view | Central control point | Walk to every unit |
| Unit left running | Stops automatically | Runs until someone notices |
| Scheduled operation | By actual occupancy | Fixed time always |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Faisaliyah is a relatively modern district with villas and compounds with good space and contemporary design, many with one central AC unit distributing air across sections. Without automation the living room and kitchen might run too cold while bedrooms are insufficient. Dividing the duct into zones with separate thermostats and dampers gives each section the comfort and efficiency it needs.
Al Faisaliyah sits in central Jeddah, a district of modern villas and residential buildings with moderate space around regular streets.
Most buildings here have one central AC unit distributed across multiple sections, and dividing the duct into multiple thermostat zones is a common requirement.
The AC setup in Al Faisaliyah
- 1
Day and night zones in the villa
Living and office areas may prefer stronger cooling during the day, while bedrooms need lighter cooling at night, so we divide them into separate zones.
- 2
Flexible ducts from plenum to sections
We run flexible ducts from the plenum to each villa section with controllable dampers on each branch.
- 3
Plenum box in safe protected space
We install the plenum in a plant room or shared space protected from outside moisture and heat.
Before the visit
Before our visit in Al Faisaliyah
- 1
Prepare villa plan and specify zones needed
Gather the villa plan and specify which sections need separate thermostats and how to group other sections.
- 2
Provide access to plant room and duct
Make sure the team can reach the plant room and main duct with protected space for the plenum box.
- 3
Confirm access to external walls and facades
Confirm safe access to external walls and facades where we may need to run wires and duct.
More districts for HVAC controls and automation
Other services in Al Faisaliyah
FAQ
Questions about HVAC controls and automation
Does building automation suit a residential villa?
Yes, and a Jeddah villa benefits particularly because it has several zones with different use patterns between day and night. We fit a thermostat for each zone and link the units so bedrooms run independently from the reception and the kitchen. The survey sets the number of circuits needed.
How do control cables run in a finished building?
In a finished building we run cables in trunking alongside the ductwork and copper piping. Where the duct is above a suspended ceiling the route is straightforward. The survey finds the best path for each building before any cable is pulled.
Can air dampers work with the thermostats?
Yes, a motorised damper receives a signal from the thermostat, opens when the zone needs cooling and closes when the set temperature is reached. This makes zoning more precise where one duct serves several areas, and the survey sets the correct position for each damper.
Does Jeddah's humidity affect control wiring?
Jeddah's humid coastal air makes it important to use cables with a suitable outer sheath and to seal all connections firmly against oxidation, especially where routes pass near outdoor units. We account for this in how we plan the route, fix the cables and test every circuit before handover.
Can each zone be set to start and stop at set times?
Yes, a thermostat that supports scheduling allows you to set start and stop times for each zone separately. This is particularly useful in offices and facilities with fixed working hours. The survey determines the right thermostat type for each zone based on the unit type and wiring method.
In my villa, the living room is too cold and the kitchen too warm, how to fix this?
We divide the duct so the living room and kitchen have separate zones with independent thermostats, each controlling its own temperature.
How do you run wires and duct through the villa's large spaces?
We plan routes through hidden walls and ceilings with protected wires against moisture, heat and dust.
The villa is near the coast, does salty air affect the thermostat?
We choose thermostat locations away from external walls and windows, installing them in sealed boxes protected from outside air.
After installation, how do I check each zone works correctly?
We test each thermostat and damper on site and confirm temperatures reach the set values in each section.


























































































