HVAC for learning spaces

School HVAC in Al Ghawla

In Al Ghawla, east Jeddah, school classrooms need cooling that maintains comfort through the long school day. Alrabih installs quiet central systems ensuring steady cool air reaches every classroom and office.

  • Even distribution
  • Quiet in class
  • Summer maintenance

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia — Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox — Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

When a school needs a specialist

  1. 1

    Hot classrooms affecting learning

    When teachers report heat that breaks concentration and tires students by midday, the problem is usually in air distribution, not unit capacity. A site survey finds where it goes wrong and what is needed.

  2. 2

    Unit noise interrupting the lesson

    A unit in the wrong spot, a clogged filter or an unbalanced fan creates noise that distracts the class. We find the source on site and fix it, and at installation we choose units and routes suited to a classroom environment.

  3. 3

    Upgrading the system over summer

    The long summer break is the only window for installation or replacement work that needs extended hours inside classrooms. We plan with school management to finish before the first school day so the timetable is not affected.

Who it's for

  • Running a school that needs maintenance

    We set up a preventive and corrective maintenance contract covering classrooms, the prayer room and corridors, carrying out major work in the summer break so the school year starts with a sound system.

    Ask on WhatsApp
  • Building a new school that needs AC design

    We review drawings with the contractor and design air distribution and ductwork before ceilings close, so every classroom has even airflow and low noise from the first day of use.

    Ask on WhatsApp

What our school work covers

  • Survey of all rooms
  • Air distribution and unit placement
  • Units beyond students' reach
  • Ductwork to SMACNA standards
  • Preventive and corrective maintenance contracts
Request a quote

How we work

How we work

  1. 1

    School building survey

    We visit the school, measure classrooms, corridors and the prayer room, and record heat sources and loads in each space before making any recommendation.

  2. 2

    System design and planning

    We draw a layout showing unit positions, duct routes and ventilation openings, and agree an installation schedule with school management so work does not clash with classes.

  3. 3

    Installation during the break

    We carry out installation during the holiday or at times that do not disrupt school, mounting units in high or protected positions away from students.

  4. 4

    Commissioning and handover

    We run the full system and check air distribution in every classroom, measuring the air at desk level, then hand over to the school with a record of what was done.

Planned installation or scattered units?

AlrabihThe usual way
Air distributionDesigned for the classroomUneven, corners stay hot
Noise levelSiting and route reduce noiseUnit drowning out the teacher
Unit positionOut of students' reachAt hand height
Summer servicePlanned before term startsFaults appear in the first week
Fresh air supplyDesigned into the layoutAn open window or nothing

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Similar project? Send us the details

Customer reviews

What our customers say

4.8

From 10 Google reviews

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Ghawla is a growing district with multi-storey schools featuring classrooms of varying sizes and some with modern extensions. The mix of older and newer structures demands flexible HVAC that handles diverse architectural layouts. The main pressure is ensuring cool air reaches every classroom equally, especially those distant from the outdoor units.

Al Ghawla sits in east Jeddah, a fast-growing residential area with several schools of varying sizes and designs.

Al Ghawla schools range from modern buildings to older extensions, most requiring custom assessment to determine the unit and duct configuration.

The AC setup in Al Ghawla

  1. 1

    Multi-unit system for mixed-age buildings

    Schools with older wings and modern sections benefit from separate outdoor units per section, easing maintenance and independent control.

  2. 2

    Flexible ductwork in architectural extensions

    Modern extensions often lack space for rigid large ducts, so we use insulated flexible ducts to save space without sacrificing performance.

  3. 3

    Outdoor units at multiple levels

    Multi-storey Al Ghawla schools may need outdoor units on both the roof and upper-floor walls, depending on engineering layout.

Before the visit

Before our visit in Al Ghawla

  1. 1

    Provide architectural drawings for each building section

    If the school has several wings or extensions, send drawings of each section so we fully understand the layout before our visit.

  2. 2

    Identify access points for each building section

    Show us roof access, corridors and plant room locations for each section, old or new, to determine routing paths.

  3. 3

    Coordinate survey timing with school management

    Alert school management to survey timing, preferably during long summer break when no student activities are running.

FAQ

Questions about School HVAC

How do you keep noise low inside the classroom?

Noise usually comes from high air velocity or an indoor unit mounted on a shared wall between two classrooms. We select units with low sound ratings, calculate air velocity at each outlet to prevent whistling, and insulate duct runs above the suspended ceiling. The exact unit position and diffuser angle are decided during a site survey of each room.

How do you handle the prayer room and corridors alongside classrooms?

The prayer room needs wide, quiet air distribution at low level above worshippers, which is quite different from a classroom. Corridors need enough cooling to prevent hot air from flowing into classrooms when doors open. We design each zone on its own air circuit with a separate thermostat; the final layout depends on floor area and ceiling height on site.

Can ductwork be added to an existing school building?

In most cases, yes. We check the gap between the ceiling and the slab, and how accessible the ceiling void is, before making any decision. We fabricate round or rectangular ducts in our own workshop to match the building's exact dimensions, and we route them to avoid structural columns and penetrations. Where ceiling space is too tight, cassette or concealed units may be the better fit.

Why are indoor units positioned out of students' reach?

A low-mounted unit in a room full of students is easily damaged: fins get bent, the drain port gets blocked, and the fan grille gets broken. We mount units at heights and positions that keep them clear of students, while still delivering cooled air down to the seated zone. The precise position is set after the team measures ceiling height and seating layout in each room.

Can the work be done during the school year?

Large tasks such as running new ductwork or replacing multiple units are scheduled during the long summer break to avoid any disruption to lessons. Routine maintenance and isolated repairs can be arranged outside school hours or at weekends in coordination with school management. Work inside classrooms during the school day requires a site assessment first to confirm it can be done without causing disruption.

Our school is old inside but has a modern added floor, how do we cool both?

This needs careful assessment of the whole building, and we design a system splitting units between the older section and the modern addition in balanced proportion.

How do you prevent cool air loss in long ductwork?

We use high-grade thermal insulation around ducts, regulate airflow speed and divide the network into balanced zones.

Does intense Jeddah heat dramatically increase our power bill?

Yes, intense heat increases load, but high-efficiency units and regular maintenance noticeably reduce consumption.

When should we do major HVAC maintenance before the school year starts?

Major maintenance should be done at least two weeks before summer break ends, ensuring all units and ducts are safe and ready.

The Jeddah corniche in cool weather

Plan your school HVAC before the season

Contact Alrabih to book a school survey, Saturday to Thursday, and we will set a plan that finishes before the first day of term.

CallWhatsApp