Window unit to split
Window-to-split conversion in Al Salamah
In Al Salamah, west Jeddah, modern villas and homes benefit from replacing window units with quiet, efficient split systems. We seal the window opening with blockwork, insulation and paint, then fit the new split through its own discrete core hole.
- Sealed opening
- Window restored
- Quiet split
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Why owners make the switch
- 1
Non-stop noise from the old unit
The window unit motor runs right inside the room, and the vibration gets worse over the years. Many owners say sleeping next to it has become impossible, and switching to a split removes the source entirely.
- 2
The wall opening lets in heat and dust
The foam and tape sealing the gap around a window unit frame degrade in Jeddah's salty, humid air. The large opening becomes a clear source of heat loss, dust in the windy season and sometimes rain in winter.
- 3
The blocked window darkens the room
A window unit fills the whole window or most of it, so the room loses its natural light and ventilation at times when you do not need cooling. Getting the window back fully changes the room noticeably.
Who it's for
Own a villa and want the windows back
We remove the window units from your villa rooms, close each opening with block, insulation and plaster, then fit a split in each room through its own core hole.
Ask on WhatsAppManaging a rental flat and want to raise its value
We convert the flat's window unit to a quiet split and restore the wall and window to their original condition, improving the unit for the next tenant.
Ask on WhatsApp
What the conversion covers
- Remove old unit and frame
- Block plaster and insulation
- Paint inside and outside
- New core hole for split
- Insulated copper and drain
How we work
How we work
- 1
Survey the wall and opening
We check the wall thickness and the build around the old opening, agree where the new core hole for the split goes away from the old frame, and decide where the outdoor unit will sit.
- 2
Remove and close
We remove the window unit and its frame without breaking the surrounding wall, then close the opening with blockwork or lightweight concrete to match the original construction, with thermal insulation set inside the layers before plastering.
- 3
Plaster and paint both sides
We plaster and paint the closed opening on both the inside and outside faces to match the existing wall, leaving no trace of the old opening that could let in air or moisture.
- 4
Fit the new split
We core the agreed spot for the split, run insulated Mueller copper and a drain line with the correct fall, vacuum the line before start-up and test everything with you present.
A proper seal or a quick patch?
| Alrabih | The usual way | |
|---|---|---|
| Closing the opening | Block, plaster and insulation | Foam or a timber board |
| Outside face | Plastered and painted flush | Visible mark or cracks |
| Thermal insulation | Inside wall before plastering | None |
| New split core hole | Chosen away from old frame | Wherever drilling is easiest |
| Outside paint | Matched to existing wall colour | Different colour or unpainted |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed in Jeddah.
Customer reviews
What our customers say
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Salamah's western districts feature relatively modern buildings with spacious outdoor areas, so the villas and homes here face direct sun on western and southern facades, and many original owners installed temporary window units years ago. Replacing the window with a modern split restores cooling efficiency, opens the window view, and eliminates the noise and dust that seeps around the old frame.
Al Salamah lies in west Jeddah, an area of modern villas and residential buildings with spacious outdoor plots.
Most homes here now have split units, but some still retain a window AC in a bedroom or living area.
The AC setup in Al Salamah
- 1
Full sealing of the old opening with insulation
We seal the previous window opening with blockwork, concrete and thermal insulation to prevent heat and moisture infiltration in the villa's external walls.
- 2
Discrete small opening for the new split
The new opening is much smaller than the old window and drilled at the optimal spot for the outdoor unit and pipes.
- 3
Matching external paint and finish
We match the colour and texture of the existing external wall to ensure a uniform appearance after completion.
Before the visit
Before our visit in Al Salamah
- 1
Choose your preferred outdoor unit location
Discuss with you the best spot for the outdoor unit on the external wall or side space before we start.
- 2
Ensure the external wall is easily accessible
Make sure the external wall where the new opening and outdoor unit will sit is safely accessible to the team.
- 3
Coordinate visit timing and interior works
Let us know if the interior wall needs any electrical or structural changes so we can plan the site correctly.
More districts for Window-to-split conversion
Other services in Al Salamah
FAQ
Questions about Window-to-split conversion
Do you restore the original window after closing the AC opening?
It depends on what the original opening was. In some rooms the opening was cut into a solid wall with no window frame, so it is fully closed. If the original build can take a window, we discuss that at the survey and tell you what is actually possible in your wall.
Can the old window unit hole be reused as the new split core hole?
The old opening is usually much larger than the small core a split needs, and its position may not suit the copper and drain route. It is safer to close it fully and drill a new hole in the right place, so no hidden gaps remain to let air through or collect moisture.
How do you stop humid salty air coming through the closed opening?
We place thermal insulation inside the wall layers before plastering, and use sealing materials that form a continuous barrier from inside to outside. Jeddah's combination of humidity and salt accelerates the breakdown of any temporary patch, so we treat the closed opening as a new wall section, not a surface repair.
Do I need permission from the building management before closing the opening?
In a rented flat it is wise to check with the owner or management office first, because the work changes the building's outside face. In a villa you own the decision is yours. We explain the full scope at the survey so you can get any approval needed before the work day.
Does the job change if the wall is concrete rather than block?
Yes. A concrete wall needs a different filling method and may require a repair mix rather than standard block. We identify the wall type at the survey and choose the material that bonds solidly with the existing concrete, leaving no hidden gaps for moisture to enter later.
My window unit is old and the opening is very large, how do you seal it?
We remove the unit and dismantle the frame, then seal the opening with blockwork, concrete and thermal insulation, finish with plaster and paint to match the wall.
My external walls face west with intense afternoon heat, will this affect the new install?
The new split is designed to handle westward heat, and we mount the outdoor unit in shade or cover if possible to improve performance.
Will coastal humidity affect the new split's core hole?
We use high-grade insulation around the new core hole to prevent moisture and air leakage, and the external finish protects the edges from coastal humidity.
How far can the outdoor unit be from the indoor unit?
The distance depends on the unit size and copper run required, which we confirm after our visit based on your home layout.












































































