Sports club HVAC in Al Bahjah, Jeddah

In Al Bahjah, north-east Jeddah, sports clubs need specialised cooling because training halls generate high heat and moisture. Alrabih designs a separate cooling and ventilation system for each zone of the club, with scheduled maintenance outside training hours.

4.9 on Google
  • Multi-zone cooling
  • Fresh-air ventilation
  • No-downtime maintenance

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When a club needs a specialist

  1. 1

    Stifling air in the training hall

    Many people in one space raise heat and humidity fast. Tall ceilings complicate air distribution, and a system not designed for this load cannot reach body level down below.

  2. 2

    Changing rooms and showers always damp

    Moisture trapped in shower rooms and lockers causes odours and damages finishes. These zones need continuous damp-air extraction that is separate from the main cooling system.

  3. 3

    Reception and offices overheating

    Reception and offices have very different heat loads from the training hall, and their hours of use differ too. Putting them on one system means one zone cools well only at the expense of the other.

Who it's for

  • Building a new sports club from scratch

    We design the cooling and ventilation system alongside the building layout, so duct is installed before ceilings are closed and the club opens with a system sized for each zone.

    Ask on WhatsApp
  • Your existing hall overheats during sessions

    We inspect the existing system, identify whether the shortfall is in unit capacity or air distribution, and correct it without disrupting the training timetable.

    Ask on WhatsApp

What the job covers

What the work covers

  • Heat load survey per zone
  • G90 galvanised duct to SMACNA
  • Plenum box and air dampers
  • Outlets and flex duct above
  • Scheduled maintenance outside training hours
Request a quote

How we work

How we work

  1. 1

    Survey and zone layout

    We visit the club and record heat loads in each zone: the main hall, changing rooms, reception and offices, and agree the right system for each before any decision is made.

  2. 2

    Duct and distribution design

    We fabricate duct in our own workshop from G90 galvanized sheet, insulate with glass wool, and fit dampers to balance airflow between zones according to ceiling height and hall shape.

  3. 3

    Installation and testing

    We install units, duct, and air outlets, test line pressure, set the thermostat for each zone, and confirm that distribution reaches body level and does not stay up at the ceiling.

  4. 4

    Handover and maintenance schedule

    We hand over the system with a written preventive-maintenance plan that works around training and match times, so the club never has to pause during peak hours.

Start with step one

Why Alrabih?

Specialist design or a single system?

AlrabihThe usual way
Air distributionReaches body levelPools at the ceiling
Different zonesEach zone its own systemOne system, no balance
Changing roomsContinuous damp-air extractionDamp and odour build-up
MaintenanceScheduled outside trainingClashes with club hours
Fresh airContinuous exchangeStale air stays
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Bahjah is a relatively modern district with residential, commercial and open-plan spaces, home to several sports facilities and clubs requiring robust cooling systems. Training halls and sports centres here need precisely designed duct runs and multiple air outlets because user numbers peak at certain hours, and moisture from physical exertion demands tight control of both temperature and humidity.

Al Bahjah lies in north-east Jeddah, a mixed area of residential buildings and sports facilities on relatively open plots.

Central ducted systems with distributed air runs are standard in clubs here, with dampers fitted to control flow to each zone.

The AC setup in Al Bahjah

  1. 1

    Central system divided by activity zone

    The main training hall needs strong, separate cooling from waiting and reception areas, with air dampers controlling flow distribution by usage.

  2. 2

    Insulated ducts routed externally

    On open plots, air ducts are often insulated with glass wool and routed above ceilings or on external walls, protected from sun and humidity.

  3. 3

    Outdoor unit positioned safely in the open

    Outdoor units are mounted on solid ground or concrete pads in clear space away from foot traffic and activity, with adequate airflow around them.

Before the visit

Before our visit in Al Bahjah

  1. 1

    Confirm training schedules and hall locations

    Let us know the different training times and rest days so we can schedule installation and maintenance without disrupting club activities.

  2. 2

    Specify the outdoor unit location

    Point out the open area reserved for the outdoor unit, ensuring easy access for routine maintenance and confirming a nearby power source.

  3. 3

    Discuss duct routes and outlet positions

    Agree with the club management on the best duct routing, whether above ceilings or on walls, and air outlet positions in each hall to ensure even spread.

FAQ

Questions about Sports club HVAC

How do you distribute air in a hall with a very high ceiling?

A high ceiling means cold air tends to stay up. We solve this by selecting air outlets that throw air horizontally or downward, calculating flow velocity at the survey, and using flexible duct so the direction can be set precisely at each outlet.

Can you handle the humidity in shower rooms and changing areas?

These areas need air extraction at a higher exchange rate than the main hall. We design them as a separate zone with dedicated extraction fans and vents that maintain negative pressure, stopping moisture from spreading to the rest of the club. We use insulation materials such as Armaflex that stand up to a damp environment.

How do you separate cooling for the hall, reception and offices?

Each zone has its own thermostat set to its actual load and hours. The training hall peaks during sessions, while offices need cooling only during administrative hours. Separating the zones reduces the load on each system and keeps comfort levels right in every area without one zone affecting another.

Can the hall, reception and offices be controlled independently?

Yes, and that is what we recommend. Each zone gets its own damper and thermostat, so the club manager controls each area separately. The hall can run at full capacity during training while offices scale back after administrative hours end, matching comfort to the actual schedule of the club.

How do you maintain air quality when the hall is full of people?

A full training hall raises carbon dioxide and moisture levels quickly. At the survey we determine the right fresh-air change rate for the floor area and the expected number of users, then position the plenum box and fresh-air units so clean outdoor air enters and stale air leaves continuously, keeping comfort levels steady throughout each training session.

How do you design AC for a crowded training hall?

We first assess the hall's size, expected user numbers and heat generated by training, then select the AC capacity and outdoor unit based on these calculations, and position air outlets to ensure even distribution across the entire space.

The club sits on open ground, does this affect installation?

Open spaces make access easier for our team and equipment, and we place the outdoor unit in a secure location away from traffic and interference, with power cables and copper pipes protected accordingly.

Does moisture from sweat and exertion affect the system?

Yes, condensation increases due to high moisture from physical activity, so we ensure the drain pan slopes correctly and the ducts are insulated with glass wool to prevent water leakage.

How do air dampers and thermostats achieve tight control?

We install manual or automatic dampers in the plenum box and main branches to distribute cooling by zone need, and the thermostat monitors temperature continuously, adjusting fan speed to maintain comfort.

The Jeddah corniche in cool weather

Start with a club survey

Send us the club layout or hall photos on WhatsApp, or call us, and we will arrange a survey visit Saturday to Thursday from 8 am.

CallWhatsApp