Sports club HVAC in Southern Housing, Jeddah

In Southern Housing, south Jeddah, sports clubs need specialized cooling because training halls gather high heat and moisture loads. Alrabih designs the cooling and ventilation system in separate zones for each part of the club, and schedules maintenance outside training hours.

4.9 on Google
  • Multi-zone cooling
  • Fresh-air ventilation
  • No-downtime maintenance

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When a club needs a specialist

  1. 1

    Stifling air in the training hall

    Many people in one space raise heat and humidity fast. Tall ceilings complicate air distribution, and a system not designed for this load cannot reach body level down below.

  2. 2

    Changing rooms and showers always damp

    Moisture trapped in shower rooms and lockers causes odours and damages finishes. These zones need continuous damp-air extraction that is separate from the main cooling system.

  3. 3

    Reception and offices overheating

    Reception and offices have very different heat loads from the training hall, and their hours of use differ too. Putting them on one system means one zone cools well only at the expense of the other.

Who it's for

  • Building a new sports club from scratch

    We design the cooling and ventilation system alongside the building layout, so duct is installed before ceilings are closed and the club opens with a system sized for each zone.

    Ask on WhatsApp
  • Your existing hall overheats during sessions

    We inspect the existing system, identify whether the shortfall is in unit capacity or air distribution, and correct it without disrupting the training timetable.

    Ask on WhatsApp

What the job covers

What the work covers

  • Heat load survey per zone
  • G90 galvanised duct to SMACNA
  • Plenum box and air dampers
  • Outlets and flex duct above
  • Scheduled maintenance outside training hours
Request a quote

How we work

How we work

  1. 1

    Survey and zone layout

    We visit the club and record heat loads in each zone: the main hall, changing rooms, reception and offices, and agree the right system for each before any decision is made.

  2. 2

    Duct and distribution design

    We fabricate duct in our own workshop from G90 galvanized sheet, insulate with glass wool, and fit dampers to balance airflow between zones according to ceiling height and hall shape.

  3. 3

    Installation and testing

    We install units, duct, and air outlets, test line pressure, set the thermostat for each zone, and confirm that distribution reaches body level and does not stay up at the ceiling.

  4. 4

    Handover and maintenance schedule

    We hand over the system with a written preventive-maintenance plan that works around training and match times, so the club never has to pause during peak hours.

Start with step one

Why Alrabih?

Specialist design or a single system?

AlrabihThe usual way
Air distributionReaches body levelPools at the ceiling
Different zonesEach zone its own systemOne system, no balance
Changing roomsContinuous damp-air extractionDamp and odour build-up
MaintenanceScheduled outside trainingClashes with club hours
Fresh airContinuous exchangeStale air stays
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Southern Housing has residential compounds with sports facilities scattered among villas and apartment blocks. Training halls and gymnasiums in these clubs see heavy daily use and need continuous cooling with constant air changes to remove the moisture and heat built up from intense activity. The high coastal humidity in the area adds to the challenge, so a distribution system with separate ducts and dampers for each club section ensures even comfort without interruption.

Southern Housing is in south Jeddah, a district of large residential compounds with sports clubs and courts set among villas and apartment blocks.

The central cooling system in clubs here distributes air from one chiller through separate ducts to each training area with continuous air change.

The AC setup in Southern Housing

  1. 1

    Separate ducts for each training zone

    Each training hall or court has its own duct line with a damper to control cold air flow to that area.

  2. 2

    Central chiller with plenum box

    The central unit distributes cold air through the plenum box, which splits the flow into separate branches for each zone.

  3. 3

    Air outlets evenly spaced across the ceiling

    The air outlets are evenly spaced across the ceiling to ensure cold air reaches every part of the training floor.

Before the visit

Before our visit in Southern Housing

  1. 1

    Inspect the ceiling and outdoor space

    Make sure the ceiling allows space for ducts and glass-wool insulation, and that there is room on or beside the club roof for the outdoor unit.

  2. 2

    Align the work schedule with training hours

    Contact club management about training and event schedules so we can choose installation and testing times that do not conflict with sports activity.

  3. 3

    Confirm the entry point for equipment and materials

    Let us know the main entrance to the hall or the nearest point to unload equipment, ducts and units so access is straightforward and safe.

FAQ

Questions about Sports club HVAC

How do you distribute air in a hall with a very high ceiling?

A high ceiling means cold air tends to stay up. We solve this by selecting air outlets that throw air horizontally or downward, calculating flow velocity at the survey, and using flexible duct so the direction can be set precisely at each outlet.

Can you handle the humidity in shower rooms and changing areas?

These areas need air extraction at a higher exchange rate than the main hall. We design them as a separate zone with dedicated extraction fans and vents that maintain negative pressure, stopping moisture from spreading to the rest of the club. We use insulation materials such as Armaflex that stand up to a damp environment.

How do you separate cooling for the hall, reception and offices?

Each zone has its own thermostat set to its actual load and hours. The training hall peaks during sessions, while offices need cooling only during administrative hours. Separating the zones reduces the load on each system and keeps comfort levels right in every area without one zone affecting another.

Can the hall, reception and offices be controlled independently?

Yes, and that is what we recommend. Each zone gets its own damper and thermostat, so the club manager controls each area separately. The hall can run at full capacity during training while offices scale back after administrative hours end, matching comfort to the actual schedule of the club.

How do you maintain air quality when the hall is full of people?

A full training hall raises carbon dioxide and moisture levels quickly. At the survey we determine the right fresh-air change rate for the floor area and the expected number of users, then position the plenum box and fresh-air units so clean outdoor air enters and stale air leaves continuously, keeping comfort levels steady throughout each training session.

How do you design cooling for a training hall crowded with athletes?

We divide the hall into zones and distribute the air outlets so cooling reaches every person evenly, and we size the system based on the number of athletes and the heat load from intense training.

Can you access the ceiling space to run the ducts?

We inspect the ceiling before design to map the duct route and outdoor unit location, and coordinate with club management to ensure the run does not conflict with wiring or other fixtures.

High humidity affects the training hall's cooling, how do you handle it?

We select a cooling unit with sufficient moisture removal capacity to dehumidify the air loaded with sweat and exertion, and we check that condensate drains regularly from the evaporator.

When do you service the system so it does not disrupt training?

We schedule maintenance outside the club's scheduled training hours and coordinate with management to pick times that do not clash with sports activity.

The Jeddah corniche in cool weather

Start with a club survey

Send us the club layout or hall photos on WhatsApp, or call us, and we will arrange a survey visit Saturday to Thursday from 8 am.

CallWhatsApp