Testing and commissioning in Al Mulaisa, Jeddah
In Al Mulaisa, south Jeddah, central AC and cooling projects require precise inspection before actual operation begins. Alrabih's team tests every set of copper pipes and refrigerant line and electrical connection, measures the air at each outlet, and records all data.
4.9 on Google- Line test
- Air balance
- Controls set
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When commissioning becomes necessary
- 1
A new system before handover
The contractor has finished and handover is due. Before the owner signs off, you need confirmation that the line is tight, the ductwork distributes air evenly and the thermostat controls the system as designed. No earlier stage replaces this step.
- 2
A major change to an existing system
Rooms have been added, a large duct section replaced or the central unit changed. A major modification shifts the pressure and airflow balance across the whole system and calls for a full test as if it were new.
- 3
Rooms that cool unevenly
Some rooms are too cold while others barely cool, even though the system runs. The cause is usually dampers that were never balanced or air outlets sized for a different room, both of which are corrected during the balancing stage of commissioning.
Who it's for
Your new villa is ready for contractor handover
We test the refrigerant line, ductwork and every air outlet, set the dampers and check the thermostat before you accept the system from the contractor.
Ask on WhatsAppYou have added floors and modified the AC system
A major modification shifts balance across the whole system. We test pressure and airflow and reset every damper across all zones.
Ask on WhatsApp
What the job covers
What the commissioning covers
- Line pressure and vacuum test
- Electrical circuits and protection checks
- Air temperature at every outlet
- Damper adjustment for room balance
- Thermostat and control panel check
How we work
How we work
- 1
Pre-start check
Before start-up the technician checks copper joints, ductwork connections and wiring, and confirms insulation is intact and ducts are clear. A fault found before start-up is far easier to correct than one found after.
- 2
Line test
We pressurise the refrigerant line and watch the reading to confirm no leak, then vacuum the line to remove air and moisture, hold the reading steady, and only then release the refrigerant.
- 3
First start-up and airflow
We start the system and measure the air temperature at every outlet, then adjust each damper until the rooms reach the temperatures the system was designed to deliver.
- 4
Controls check and handover
We test the thermostat and any control panel, confirm the system responds to every command, then show the owner how to set the thermostat and the right setting for each room before we hand the system over.
Why Alrabih?
Planned commissioning or a quick switch-on?
| Alrabih | The usual way | |
|---|---|---|
| Leak test | Pressure and vacuum test | Start-up with no test |
| Room balance | Each damper measured and set | Uneven cooling left as is |
| Electrical check | Protections and wiring reviewed | Only visual power-on |
| Controls | Thermostat set and tested | Left on its first setting |
| Plenum box | Distribution checked from plenum | Not checked |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Mulaisa is a mixed residential and commercial zone with mid-rise residential blocks, villas and occasionally small warehouses. Central systems in these buildings need testing for air balance across floors and different flats, and verification that each unit receives adequate cold air. The mixed building type means the outdoor unit location may sometimes be limited.
Al Mulaisa sits in south Jeddah, a mixed residential and commercial zone with blocks and villas.
Most central systems here serve a single block or group of villas, distributing air through hidden ductwork between floors.
The AC setup in Al Mulaisa
- 1
Central system serving a residential block
Most blocks in Al Mulaisa have one central AC system serving all flats, with hidden ductwork running between floors.
- 2
Flexible ducts between main duct and outlets
Final connections from the main duct to outlets in each flat are flexible ducts for ease of distribution.
- 3
Central thermostat controlling the entire system
Usually there is one central control unit in the machinery room or block lobby controlling temperature across all floors.
Before the visit
Before our visit in Al Mulaisa
- 1
Confirm the outdoor unit location and safe access to it
Check that the outdoor unit location is safe with enough space for the team, and that access to it is easy from the building roof or designated space.
- 2
Arrange access keys to the machinery room and floors
Make sure the testing team has keys or authorization to access the machinery room and different floors of the block.
- 3
Coordinate with the contractor on required temperatures and settings
Agree with the contractor before the visit on the required temperature for each floor or area in the block.
More districts for Testing and commissioning
Other services in Al Mulaisa
FAQ
Questions about Testing and commissioning
What is the difference between installation and commissioning?
Installation means fitting and connecting the parts. Commissioning comes after, to confirm that what was fitted works as designed: the line is tight, air reaches every room in the right quantity and the thermostat controls accurately. The two stages are different and neither replaces the other.
Does a small building need full commissioning?
Building size does not decide whether commissioning is needed. Even in a small flat or villa there may be a refrigerant leak or a damper that leaves one room far colder than another. The site and the system design decide the scope of testing required, and that becomes clear at the survey.
How does Jeddah's humid air affect the vacuum stage?
Jeddah's high humidity means trapped air in the refrigerant line carries more moisture than in a dry climate. That moisture left in the line gradually strains the compressor and weakens cooling. We therefore run the vacuum pump until the reading is stable rather than stopping after a fixed time.
What if one room is still warmer after commissioning?
We go back to the air temperature at that room's outlets, check the damper and the flexible duct that feed it, and confirm the air outlet suits the room's size. Adjusting the damper is usually enough; if the cause lies in the system design itself, we explain the right solution before any further work.
Do flexible duct connections need checking during commissioning?
Yes. A flexible duct connecting a rigid duct run to an air outlet can crack or partly detach during installation without being obvious. That gap reduces air reaching the room and makes balancing readings unreliable. The technician therefore inspects every flexible duct connection before measuring airflow at the outlets.
How do you test air balance across different floors of a block?
We measure air temperature at outlets on each floor and adjust duct dampers to ensure each floor receives the required cooling.
The outdoor unit in some blocks is sometimes in a limited space, does that affect testing?
Yes, we agree in advance with the contractor on the outdoor unit location and available space, and ensure the clearances around the unit allow adequate air intake and ventilation.
Humidity near the coast affects copper pipes, how do you handle it?
We dry all connections and pipes after vacuum testing, and recommend periodic inspection of external pipes to check for corrosion.
Do you test water drainage from every flat in the block?
Yes, we inspect the drain path from each unit and coordinate with the contractor to confirm drain pipes are correctly connected.


























































































