Testing and commissioning in Al Sharqiyah, Jeddah

In Al Sharqiyah, east Jeddah, an industrial and commercial area with high activity, Alrabih tests new AC and refrigeration systems in warehouses, workshops and distribution centres before operation begins. We inspect ductwork, lines, connections and readings, providing a written report.

4.9 on Google
  • Line test
  • Air balance
  • Controls set

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When commissioning becomes necessary

  1. 1

    A new system before handover

    The contractor has finished and handover is due. Before the owner signs off, you need confirmation that the line is tight, the ductwork distributes air evenly and the thermostat controls the system as designed. No earlier stage replaces this step.

  2. 2

    A major change to an existing system

    Rooms have been added, a large duct section replaced or the central unit changed. A major modification shifts the pressure and airflow balance across the whole system and calls for a full test as if it were new.

  3. 3

    Rooms that cool unevenly

    Some rooms are too cold while others barely cool, even though the system runs. The cause is usually dampers that were never balanced or air outlets sized for a different room, both of which are corrected during the balancing stage of commissioning.

Who it's for

  • Your new villa is ready for contractor handover

    We test the refrigerant line, ductwork and every air outlet, set the dampers and check the thermostat before you accept the system from the contractor.

    Ask on WhatsApp
  • You have added floors and modified the AC system

    A major modification shifts balance across the whole system. We test pressure and airflow and reset every damper across all zones.

    Ask on WhatsApp

What the job covers

What the commissioning covers

  • Line pressure and vacuum test
  • Electrical circuits and protection checks
  • Air temperature at every outlet
  • Damper adjustment for room balance
  • Thermostat and control panel check
Request a quote

How we work

How we work

  1. 1

    Pre-start check

    Before start-up the technician checks copper joints, ductwork connections and wiring, and confirms insulation is intact and ducts are clear. A fault found before start-up is far easier to correct than one found after.

  2. 2

    Line test

    We pressurise the refrigerant line and watch the reading to confirm no leak, then vacuum the line to remove air and moisture, hold the reading steady, and only then release the refrigerant.

  3. 3

    First start-up and airflow

    We start the system and measure the air temperature at every outlet, then adjust each damper until the rooms reach the temperatures the system was designed to deliver.

  4. 4

    Controls check and handover

    We test the thermostat and any control panel, confirm the system responds to every command, then show the owner how to set the thermostat and the right setting for each room before we hand the system over.

Start with step one

Why Alrabih?

Planned commissioning or a quick switch-on?

AlrabihThe usual way
Leak testPressure and vacuum testStart-up with no test
Room balanceEach damper measured and setUneven cooling left as is
Electrical checkProtections and wiring reviewedOnly visual power-on
ControlsThermostat set and testedLeft on its first setting
Plenum boxDistribution checked from plenumNot checked
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Sharqiyah is a sprawling industrial zone with large warehouses, workshops, distribution centres and worker housing, mostly mid-height with wide open spaces needing uniform cooling. AC systems here are typically central with large ductwork and multiple diffusers to cover the wide areas. Testing focuses on balanced distribution and strong airflow to ensure adequate cooling for hot warehouse spaces.

Al Sharqiyah is in east Jeddah, a large industrial and commercial zone with warehouses, workshops and wide open spaces.

Most warehouses and workshops in Al Sharqiyah have high-capacity central AC systems with numerous diffusers to cover large spaces.

The AC setup in Al Sharqiyah

  1. 1

    High-capacity central systems for large spaces

    Large warehouses and workshops have powerful outdoor units, thick copper lines and numerous diffusers.

  2. 2

    Ductwork insulated with glass-wool

    Ductwork is usually insulated with glass-wool to maintain air coolness over long distances.

  3. 3

    High-level diffusers in ceilings and walls

    Air diffusers are mounted high to cover the wide space and avoid disruptive air currents.

Before the visit

Before our visit in Al Sharqiyah

  1. 1

    Confirm installation is fully complete before testing

    Check that all ductwork, diffusers, units and connections are installed and ready with no ongoing work.

  2. 2

    Provide site plan and diffuser list

    Send us the warehouse or workshop layout and the location of each diffuser and the outdoor unit.

  3. 3

    Arrange site access and parking

    Ensure our team can enter the site easily and park safely without obstruction.

FAQ

Questions about Testing and commissioning

What is the difference between installation and commissioning?

Installation means fitting and connecting the parts. Commissioning comes after, to confirm that what was fitted works as designed: the line is tight, air reaches every room in the right quantity and the thermostat controls accurately. The two stages are different and neither replaces the other.

Does a small building need full commissioning?

Building size does not decide whether commissioning is needed. Even in a small flat or villa there may be a refrigerant leak or a damper that leaves one room far colder than another. The site and the system design decide the scope of testing required, and that becomes clear at the survey.

How does Jeddah's humid air affect the vacuum stage?

Jeddah's high humidity means trapped air in the refrigerant line carries more moisture than in a dry climate. That moisture left in the line gradually strains the compressor and weakens cooling. We therefore run the vacuum pump until the reading is stable rather than stopping after a fixed time.

What if one room is still warmer after commissioning?

We go back to the air temperature at that room's outlets, check the damper and the flexible duct that feed it, and confirm the air outlet suits the room's size. Adjusting the damper is usually enough; if the cause lies in the system design itself, we explain the right solution before any further work.

Do flexible duct connections need checking during commissioning?

Yes. A flexible duct connecting a rigid duct run to an air outlet can crack or partly detach during installation without being obvious. That gap reduces air reaching the room and makes balancing readings unreliable. The technician therefore inspects every flexible duct connection before measuring airflow at the outlets.

The large warehouse has different storage zones, do you test cooling in each zone?

Yes, we measure airflow in each zone and may adjust dampers to distribute cooling according to each zone's needs.

The new workshop has a high roof and wide space, how do you measure cooling adequacy?

We measure airflow at multiple diffusers spread across the space and confirm the indoor temperature drops at a reasonable rate.

Dust is heavy in Al Sharqiyah and sun heat is intense, do they affect testing?

Dust can affect airflow readings, so we temporarily cover air inlets during testing, and extreme heat means indoor temperatures take longer to fall.

Long refrigerant lines from the outdoor unit, how do you test them?

We vacuum-test the entire line from the outdoor unit to the indoor unit or plenum, checking for leaks before introducing refrigerant.

The Jeddah corniche in cool weather

Hand over your system after a full test

WhatsApp a brief description of the system and building type, or call us, and we will arrange the survey and commissioning visit, Saturday to Thursday.

CallWhatsApp