Testing and commissioning in Al Zahra, Jeddah

In Al Zahra, west Jeddah, new systems need thorough checking before handover. Alrabih's team tests every refrigerant line, duct and electrical circuit, measures air, pressure and vacuum, and records each result precisely.

4.9 on Google
  • Line test
  • Air balance
  • Controls set

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When commissioning becomes necessary

  1. 1

    A new system before handover

    The contractor has finished and handover is due. Before the owner signs off, you need confirmation that the line is tight, the ductwork distributes air evenly and the thermostat controls the system as designed. No earlier stage replaces this step.

  2. 2

    A major change to an existing system

    Rooms have been added, a large duct section replaced or the central unit changed. A major modification shifts the pressure and airflow balance across the whole system and calls for a full test as if it were new.

  3. 3

    Rooms that cool unevenly

    Some rooms are too cold while others barely cool, even though the system runs. The cause is usually dampers that were never balanced or air outlets sized for a different room, both of which are corrected during the balancing stage of commissioning.

Who it's for

  • Your new villa is ready for contractor handover

    We test the refrigerant line, ductwork and every air outlet, set the dampers and check the thermostat before you accept the system from the contractor.

    Ask on WhatsApp
  • You have added floors and modified the AC system

    A major modification shifts balance across the whole system. We test pressure and airflow and reset every damper across all zones.

    Ask on WhatsApp

What the job covers

What the commissioning covers

  • Line pressure and vacuum test
  • Electrical circuits and protection checks
  • Air temperature at every outlet
  • Damper adjustment for room balance
  • Thermostat and control panel check
Request a quote

How we work

How we work

  1. 1

    Pre-start check

    Before start-up the technician checks copper joints, ductwork connections and wiring, and confirms insulation is intact and ducts are clear. A fault found before start-up is far easier to correct than one found after.

  2. 2

    Line test

    We pressurise the refrigerant line and watch the reading to confirm no leak, then vacuum the line to remove air and moisture, hold the reading steady, and only then release the refrigerant.

  3. 3

    First start-up and airflow

    We start the system and measure the air temperature at every outlet, then adjust each damper until the rooms reach the temperatures the system was designed to deliver.

  4. 4

    Controls check and handover

    We test the thermostat and any control panel, confirm the system responds to every command, then show the owner how to set the thermostat and the right setting for each room before we hand the system over.

Start with step one

Why Alrabih?

Planned commissioning or a quick switch-on?

AlrabihThe usual way
Leak testPressure and vacuum testStart-up with no test
Room balanceEach damper measured and setUneven cooling left as is
Electrical checkProtections and wiring reviewedOnly visual power-on
ControlsThermostat set and testedLeft on its first setting
Plenum boxDistribution checked from plenumNot checked
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Zahra has modern residential buildings, commercial annexes and small workshops with varied AC systems from central ducted to separate units. Testing respects building type and use: for residences we test damper balance and long ductwork, for workshops and commercial annexes we focus on pressure, vacuum and thermostat testing. High humidity and salty coastal air from nearby make initial vacuum testing critical.

Al Zahra lies in west Jeddah, a district of modern residential buildings with some commercial annexes and small workshops.

AC systems here mix central distributed in residences and larger buildings with separate units in workshops and small shops.

The AC setup in Al Zahra

  1. 1

    Testing distributed central in residential building

    We test the main plenum, long ductwork, branches and dampers to ensure equal distribution and no leakage.

  2. 2

    Testing separate units in workshops

    Each separate unit in a small workshop is tested independently for pressure, vacuum, thermostat and electrical circuits.

  3. 3

    Complete airflow and drain measurement

    We measure airflow at every outlet and water discharge from units, and record all values for future comparison.

Before the visit

Before our visit in Al Zahra

  1. 1

    Obtain complete technical drawings

    Provide original system drawings and technical specifications so our team can verify installation against design.

  2. 2

    Coordinate with project manager or owner

    Ensure the project manager or owner is available at test time to sign the report and approve results.

  3. 3

    Ensure full access is available

    Provide safe and full access to plenum units, ducts, outlets and copper pipes.

FAQ

Questions about Testing and commissioning

What is the difference between installation and commissioning?

Installation means fitting and connecting the parts. Commissioning comes after, to confirm that what was fitted works as designed: the line is tight, air reaches every room in the right quantity and the thermostat controls accurately. The two stages are different and neither replaces the other.

Does a small building need full commissioning?

Building size does not decide whether commissioning is needed. Even in a small flat or villa there may be a refrigerant leak or a damper that leaves one room far colder than another. The site and the system design decide the scope of testing required, and that becomes clear at the survey.

How does Jeddah's humid air affect the vacuum stage?

Jeddah's high humidity means trapped air in the refrigerant line carries more moisture than in a dry climate. That moisture left in the line gradually strains the compressor and weakens cooling. We therefore run the vacuum pump until the reading is stable rather than stopping after a fixed time.

What if one room is still warmer after commissioning?

We go back to the air temperature at that room's outlets, check the damper and the flexible duct that feed it, and confirm the air outlet suits the room's size. Adjusting the damper is usually enough; if the cause lies in the system design itself, we explain the right solution before any further work.

Do flexible duct connections need checking during commissioning?

Yes. A flexible duct connecting a rigid duct run to an air outlet can crack or partly detach during installation without being obvious. That gap reduces air reaching the room and makes balancing readings unreliable. The technician therefore inspects every flexible duct connection before measuring airflow at the outlets.

How do you test a long-ducted central system in a residential building?

We measure vacuum and pressure in the plenum and main duct, then each branch, and measure airflow at every outlet to verify equal distribution.

Small workshops have separate cooling units, what do you test?

We test electrical circuits and connections, pressure and vacuum in refrigerant lines, and thermostat and compressor activation at different temperatures.

Salt and humidity from nearby coast affect seals, what do you do?

We test initial vacuum at high precision in all copper pipes and flexible connections to catch any moisture before sealing, and record the result.

Do you test drain flow and electrical control?

Yes, we check water flow in the drain line and record discharge rate, and test full electrical control including thermostat and switches.

The Jeddah corniche in cool weather

Hand over your system after a full test

WhatsApp a brief description of the system and building type, or call us, and we will arrange the survey and commissioning visit, Saturday to Thursday.

CallWhatsApp