Testing and commissioning in Kilo 14, Jeddah

In Kilo 14, south Jeddah, modifications to existing systems and new projects need thorough testing to confirm every air outlet works correctly and pressures and thermostats are precisely calibrated. Alrabih's team records every reading and setting in an official handover document.

4.9 on Google
  • Line test
  • Air balance
  • Controls set

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When commissioning becomes necessary

  1. 1

    A new system before handover

    The contractor has finished and handover is due. Before the owner signs off, you need confirmation that the line is tight, the ductwork distributes air evenly and the thermostat controls the system as designed. No earlier stage replaces this step.

  2. 2

    A major change to an existing system

    Rooms have been added, a large duct section replaced or the central unit changed. A major modification shifts the pressure and airflow balance across the whole system and calls for a full test as if it were new.

  3. 3

    Rooms that cool unevenly

    Some rooms are too cold while others barely cool, even though the system runs. The cause is usually dampers that were never balanced or air outlets sized for a different room, both of which are corrected during the balancing stage of commissioning.

Who it's for

  • Your new villa is ready for contractor handover

    We test the refrigerant line, ductwork and every air outlet, set the dampers and check the thermostat before you accept the system from the contractor.

    Ask on WhatsApp
  • You have added floors and modified the AC system

    A major modification shifts balance across the whole system. We test pressure and airflow and reset every damper across all zones.

    Ask on WhatsApp

What the job covers

What the commissioning covers

  • Line pressure and vacuum test
  • Electrical circuits and protection checks
  • Air temperature at every outlet
  • Damper adjustment for room balance
  • Thermostat and control panel check
Request a quote

How we work

How we work

  1. 1

    Pre-start check

    Before start-up the technician checks copper joints, ductwork connections and wiring, and confirms insulation is intact and ducts are clear. A fault found before start-up is far easier to correct than one found after.

  2. 2

    Line test

    We pressurise the refrigerant line and watch the reading to confirm no leak, then vacuum the line to remove air and moisture, hold the reading steady, and only then release the refrigerant.

  3. 3

    First start-up and airflow

    We start the system and measure the air temperature at every outlet, then adjust each damper until the rooms reach the temperatures the system was designed to deliver.

  4. 4

    Controls check and handover

    We test the thermostat and any control panel, confirm the system responds to every command, then show the owner how to set the thermostat and the right setting for each room before we hand the system over.

Start with step one

Why Alrabih?

Planned commissioning or a quick switch-on?

AlrabihThe usual way
Leak testPressure and vacuum testStart-up with no test
Room balanceEach damper measured and setUneven cooling left as is
Electrical checkProtections and wiring reviewedOnly visual power-on
ControlsThermostat set and testedLeft on its first setting
Plenum boxDistribution checked from plenumNot checked
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Kilo 14 contains factories, workshops and closely spaced residential buildings with a high proportion of central systems featuring complex ductwork and multiple air outlets. Testing becomes critical there because new systems often need duct or flexible duct adjustments during installation, and coastal humidity demands careful inspection of insulation and drainage to prevent later problems, while closely sited buildings mean limited air intake and exhaust points.

Kilo 14 sits in Jeddah's southern industrial and residential belt, a district of factories, workshops and closely built apartment blocks.

Most systems in Kilo 14 are central with long ductwork runs and multiple air outlets, and many need pressure and flow balancing in stages.

The AC setup in Kilo 14

  1. 1

    Systems with long ductwork and multiple pressure stages

    Large systems in Kilo 14 divide into different pressure stages, and we test each stage separately then the whole system.

  2. 2

    Air outlets in hard-to-reach locations

    Some air outlets are in high ceilings or tight corners, so we use appropriate measurement equipment to reach them and verify operation.

  3. 3

    Complex condensate drainage with separate duct runs

    Some projects have separate long drainage runs, and we test for obstructions and correct negative pressure before handover.

Before the visit

Before our visit in Kilo 14

  1. 1

    Prepare safe access to ceilings and plenum boxes

    Large projects in Kilo 14 may need access to high ceilings and plenum boxes, so ensure safe ladders and adequate lighting are in place.

  2. 2

    Have the engineer and contractor available for notes and queries

    Testing requires reviewing original technical data with the engineer and contractor, so ensure both are available to address any deviations.

  3. 3

    Collect system drawings and design documents

    Gather all drawings and technical specifications for ductwork, thermostat and expected pressures before the test appointment.

FAQ

Questions about Testing and commissioning

What is the difference between installation and commissioning?

Installation means fitting and connecting the parts. Commissioning comes after, to confirm that what was fitted works as designed: the line is tight, air reaches every room in the right quantity and the thermostat controls accurately. The two stages are different and neither replaces the other.

Does a small building need full commissioning?

Building size does not decide whether commissioning is needed. Even in a small flat or villa there may be a refrigerant leak or a damper that leaves one room far colder than another. The site and the system design decide the scope of testing required, and that becomes clear at the survey.

How does Jeddah's humid air affect the vacuum stage?

Jeddah's high humidity means trapped air in the refrigerant line carries more moisture than in a dry climate. That moisture left in the line gradually strains the compressor and weakens cooling. We therefore run the vacuum pump until the reading is stable rather than stopping after a fixed time.

What if one room is still warmer after commissioning?

We go back to the air temperature at that room's outlets, check the damper and the flexible duct that feed it, and confirm the air outlet suits the room's size. Adjusting the damper is usually enough; if the cause lies in the system design itself, we explain the right solution before any further work.

Do flexible duct connections need checking during commissioning?

Yes. A flexible duct connecting a rigid duct run to an air outlet can crack or partly detach during installation without being obvious. That gap reduces air reaching the room and makes balancing readings unreliable. The technician therefore inspects every flexible duct connection before measuring airflow at the outlets.

Do you test complex new central systems in Kilo 14?

Yes, we test every new central system in full from the refrigerant line to the air outlets and thermostat, and verify pressure and flow balance at every outlet.

Long ductwork in Kilo 14 may need multiple flexible ducts, how do you test them?

We test every flexible duct and duct section to confirm there are no gaps or leaks, and measure pressure and flow before and after each connection.

Does high humidity affect the durability of duct insulation after testing?

Coastal humidity requires ongoing inspection of glass-wool insulation and drainage, so we test condensate drainage and insulation before handover and confirm they are dry.

Do you provide official documentation proving the system is sound after testing and commissioning?

Yes, we hand you a written record with every pressure and flow reading, thermostat setting and notes on the condition of the ductwork, insulation and drainage.