Tower and office building HVAC in Al Hamdaniyah, Jeddah
In Al Hamdaniyah, east Jeddah, where small administrative and office buildings mix with open spaces and parking areas, tower and office building HVAC needs a central system allowing later expansion and additions. Alrabih designs the ducts and units so they can be easily relocated or extended if new floors or additional spaces require air conditioning.
4.9 on Google- Zone control
- Vertical risers
- Per-floor zoning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When your building needs a specialist contractor
- 1
New office tower under construction
The hardest part is coordinating with the main contractor: fixing riser shafts and floor penetrations before concrete is poured, locating plant rooms on the right floors, and documenting everything before walls are closed.
- 2
Existing building needing a system upgrade
The old system no longer serves the current tenant load, energy losses are high, or some floors stay warm in Jeddah's humid heat with no one knowing where the fault starts. A detailed survey identifies the path forward.
- 3
New tenant redesigning their floor
Moving partition walls means relocating air outlets and dampers for every new office. A zone designed carefully lets you add the tenant without upsetting the air balance across the rest of the building.
Who it's for
Your office tower is under construction now
We coordinate with the main contractor to fix riser shafts, floor penetrations and plant room positions before walls are closed and concrete is poured.
Ask on WhatsAppYou manage an occupied office building with complaints
We survey the existing network floor by floor, identify why airflow is unbalanced across zones, and carry out corrections in phases without cutting cooling to neighbouring offices.
Ask on WhatsApp
What the job covers
What our scope covers
- Duct network design
- G90 sheet to SMACNA
- Zone layout and dampers
- Flexible connections and plenums
- Commissioning and air balancing
How we work
How we work
- 1
Survey and drawing review
We visit the site and review the architectural and structural drawings, fixing riser routes, plant room positions and floor penetrations in coordination with the project team.
- 2
Design and zone layout
We design the duct network, assign zones per floor and tenant, and set duct sizes, damper positions and plenum box locations for every branch.
- 3
Duct fabrication and installation
We fabricate ducts in our workshop from G90 galvanized sheet to SMACNA standards, insulate them with glass-wool, and install floor by floor in coordination with other contractors on site.
- 4
Balancing and handover
After start-up we balance airflow across all air outlets, verify each thermostat responds correctly, and hand the as-built drawings to the building management.
Why Alrabih?
Integrated design or unplanned expansion?
| Alrabih | The usual way | |
|---|---|---|
| Zone layout | Designed per floor and tenant | Estimated without design |
| Ductwork | Fabricated to calculated sizes | Random sizes used |
| Dampers | On every branch for control | Fitted where convenient |
| As-built record | Final drawings handed over | No record after handover |
| Riser insulation | Glass-wool stops condensation | Insulation skipped |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Hamdaniyah's buildings are smaller and less dense than those in Al Tawfeeq and Al Ajwad, distinguished by open spaces between them and wide parking areas, giving more room for expanding ducts and outdoor units. Most buildings here are mid-rise, some owned by an organisation or split into small units across several tenants. This urban pattern allows less complex AC design than large towers, but requires clear understanding of different tenant needs and expected growth.
Al Hamdaniyah sits in east Jeddah, a mixed district of mid-rise administrative and office buildings with open spaces between them.
Most buildings here are mid-sized with one or two central systems per building, split into at most two thermal zones per floor.
The AC setup in Al Hamdaniyah
- 1
One central system per standalone building
Most buildings here stand alone, each with its own dedicated plant room and one central AC system serving all floors.
- 2
Ample space for outdoor units on roofs and courtyards
Open spaces and wide courtyards give multiple options for outdoor unit placement without tight space constraints.
- 3
Short horizontal runs from plant room to floors
The plant room is usually on the roof or top floor, and horizontal ducts are relatively short because buildings are mid-sized.
Before the visit
Before our visit in Al Hamdaniyah
- 1
Define current floors' needs and planned expansion
Discuss current floor count and tenants, and whether plans exist to add floors or new units over the coming years.
- 2
Check roofs and available spaces
Inspect the roof and available courtyards for outdoor units and future extensions, confirming roof structural capacity if needed.
- 3
Clarify floor divisions and tenant arrangements
Get clear information on each floor, number of separate units and tenants, as this determines thermostat and thermal zone requirements.
More districts for Tower and office building HVAC
Other services in Al Hamdaniyah
FAQ
Questions about Tower and office building HVAC
How does each tenant control their own temperature independently?
Each floor or zone is fed from its own plenum box, a damper controls the volume of air entering, and the thermostat sets the required temperature. This layout lets each tenant adjust their space without affecting the floors above or below.
Do tenant fit-out works affect cooling on other floors?
When the system is designed with independent zones, redistributing outlets or moving dampers inside one floor stays isolated from the rest of the building. We review the revised layout and rebalance that zone before the tenant moves in.
How does Jeddah's humidity affect duct design in towers?
High humidity means outdoor air carries a greater moisture load, which feeds into duct sizing and treated air volumes. Risers near the facade also need thorough glass-wool insulation to stop condensation forming on the duct surface inside the building.
Can you work while the building is occupied?
Yes, and that requires phasing the work floor by floor or wing by wing so cooling is never cut to neighbouring offices. We agree a programme with building management before starting and identify at the survey which sections can be isolated without disrupting daily operations.
How is cooling managed for the tower lobby and car park?
The lobby and car park have different requirements from office floors: ceiling heights differ, heat loads vary and ventilation needs change. The lobby needs diffusers suited to tall spaces, while the car park requires mechanical ventilation working alongside the cooling. The site survey determines the right design for each space.
Do the open spaces between buildings make later system expansion easier?
Yes, the open spaces let us extend new ducts or add outdoor units without building or demolition, simply running connections from the existing network.
These buildings are relatively small, does each floor need its own thermostat?
It depends on the number of tenants and separate spaces. If one tenant occupies the whole floor, one thermostat suffices; if there are multiple independent units, we add extra thermostats.
Does the coastal humidity and salt air affect outdoor units here?
Yes, high humidity and salt air speed up corrosion, so we select units with strong protective coating and ensure correct water drainage from the condenser.
If the company grows and adds floors above, must we replace the entire system?
No, the system is designed to accommodate growth, so we relocate outdoor units higher or add new ones and coordinate new vertical ducts with the existing network.