Tower and office building HVAC in Al Mulaisa, Jeddah
In Al Mulaisa, south Jeddah, tower and office-building cooling relies on a central system distributing conditioned air from the plant room to every floor through vertical ducts. Alrabih ensures each tenant controls their zone independently, unaffected by other tenants' changes.
4.9 on Google- Zone control
- Vertical risers
- Per-floor zoning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When your building needs a specialist contractor
- 1
New office tower under construction
The hardest part is coordinating with the main contractor: fixing riser shafts and floor penetrations before concrete is poured, locating plant rooms on the right floors, and documenting everything before walls are closed.
- 2
Existing building needing a system upgrade
The old system no longer serves the current tenant load, energy losses are high, or some floors stay warm in Jeddah's humid heat with no one knowing where the fault starts. A detailed survey identifies the path forward.
- 3
New tenant redesigning their floor
Moving partition walls means relocating air outlets and dampers for every new office. A zone designed carefully lets you add the tenant without upsetting the air balance across the rest of the building.
Who it's for
Your office tower is under construction now
We coordinate with the main contractor to fix riser shafts, floor penetrations and plant room positions before walls are closed and concrete is poured.
Ask on WhatsAppYou manage an occupied office building with complaints
We survey the existing network floor by floor, identify why airflow is unbalanced across zones, and carry out corrections in phases without cutting cooling to neighbouring offices.
Ask on WhatsApp
What the job covers
What our scope covers
- Duct network design
- G90 sheet to SMACNA
- Zone layout and dampers
- Flexible connections and plenums
- Commissioning and air balancing
How we work
How we work
- 1
Survey and drawing review
We visit the site and review the architectural and structural drawings, fixing riser routes, plant room positions and floor penetrations in coordination with the project team.
- 2
Design and zone layout
We design the duct network, assign zones per floor and tenant, and set duct sizes, damper positions and plenum box locations for every branch.
- 3
Duct fabrication and installation
We fabricate ducts in our workshop from G90 galvanized sheet to SMACNA standards, insulate them with glass-wool, and install floor by floor in coordination with other contractors on site.
- 4
Balancing and handover
After start-up we balance airflow across all air outlets, verify each thermostat responds correctly, and hand the as-built drawings to the building management.
Why Alrabih?
Integrated design or unplanned expansion?
| Alrabih | The usual way | |
|---|---|---|
| Zone layout | Designed per floor and tenant | Estimated without design |
| Ductwork | Fabricated to calculated sizes | Random sizes used |
| Dampers | On every branch for control | Fitted where convenient |
| As-built record | Final drawings handed over | No record after handover |
| Riser insulation | Glass-wool stops condensation | Insulation skipped |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Mulaisa contains multi-storey office towers and residential blocks with relatively open spaces and wide roads, making team access and heavy equipment delivery to the plant room straightforward. Coastal humidity and salt air demand careful attention to copper piping and outdoor units, and coordinating the installation with building management is essential to avoid disrupting tenants' operations.
Al Mulaisa lies in south Jeddah, a district of towers and multi-storey residential and office buildings with wide roads and modern infrastructure.
Most office towers here use a central system with one or two evaporators in the plant room feeding each floor via insulated ducts.
The AC setup in Al Mulaisa
- 1
Central system with plant room on roof or basement
Most towers here place the plant room on the roof or basement to simplify vertical distribution through risers and ducts.
- 2
Plenum box and zone division on each floor
Each floor receives a plenum box that collects cooled air and distributes it via dampers and separate diffusers for each occupancy zone.
- 3
Duct insulation and flexible connections between floors
Vertical ducts are insulated with glass wool to prevent cooling loss and provide sound isolation, and flexible connections allow for minor building movement.
Before the visit
Before our visit in Al Mulaisa
- 1
Identify the plant room and roof location
Tell us exactly where the plant room is (roof or basement) and ensure there is a safe passage to it.
- 2
Coordinate with management to clear work areas
Agree with building management on evacuating or securing the floors or zones where work will take place during installation.
- 3
Mark duct and riser paths in advance
Mark clearly the existing vertical duct routes and electrical and water runs to avoid conflicts with the new installation.
More districts for Tower and office building HVAC
Other services in Al Mulaisa
FAQ
Questions about Tower and office building HVAC
How does each tenant control their own temperature independently?
Each floor or zone is fed from its own plenum box, a damper controls the volume of air entering, and the thermostat sets the required temperature. This layout lets each tenant adjust their space without affecting the floors above or below.
Do tenant fit-out works affect cooling on other floors?
When the system is designed with independent zones, redistributing outlets or moving dampers inside one floor stays isolated from the rest of the building. We review the revised layout and rebalance that zone before the tenant moves in.
How does Jeddah's humidity affect duct design in towers?
High humidity means outdoor air carries a greater moisture load, which feeds into duct sizing and treated air volumes. Risers near the facade also need thorough glass-wool insulation to stop condensation forming on the duct surface inside the building.
Can you work while the building is occupied?
Yes, and that requires phasing the work floor by floor or wing by wing so cooling is never cut to neighbouring offices. We agree a programme with building management before starting and identify at the survey which sections can be isolated without disrupting daily operations.
How is cooling managed for the tower lobby and car park?
The lobby and car park have different requirements from office floors: ceiling heights differ, heat loads vary and ventilation needs change. The lobby needs diffusers suited to tall spaces, while the car park requires mechanical ventilation working alongside the cooling. The site survey determines the right design for each space.
Can each tenant control their zone's temperature independently?
Yes, the thermostat in each tenant zone provides full control, and dedicated air dampers isolate that zone from others, so one tenant's adjustment does not affect the rest.
The roads in Al Mulaisa are wide, does that help with installation?
Yes, the wide roads and open spaces around towers make it easier for the equipment truck and installation team to reach the plant room and roof.
Does coastal salt air affect the copper pipes and outdoor units?
Salt air near the coast speeds up corrosion of unprotected metals, so we use high-quality copper pipes and ensure all pipes and fittings are fully insulated.
How do you coordinate between the installation team and building management?
We agree a construction schedule with building management before starting and stick to set times to minimize disruption to tenants and staff.