Tower and office building HVAC in Al Sahifah, Jeddah
Tower and office building cooling in Al Sahifah relies on a central chilling system distributing cooled air from the plant through insulated ducts to every floor. Alrabih designs systems balancing energy efficiency with independent tenant control.
4.9 on Google- Zone control
- Vertical risers
- Per-floor zoning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When your building needs a specialist contractor
- 1
New office tower under construction
The hardest part is coordinating with the main contractor: fixing riser shafts and floor penetrations before concrete is poured, locating plant rooms on the right floors, and documenting everything before walls are closed.
- 2
Existing building needing a system upgrade
The old system no longer serves the current tenant load, energy losses are high, or some floors stay warm in Jeddah's humid heat with no one knowing where the fault starts. A detailed survey identifies the path forward.
- 3
New tenant redesigning their floor
Moving partition walls means relocating air outlets and dampers for every new office. A zone designed carefully lets you add the tenant without upsetting the air balance across the rest of the building.
Who it's for
Your office tower is under construction now
We coordinate with the main contractor to fix riser shafts, floor penetrations and plant room positions before walls are closed and concrete is poured.
Ask on WhatsAppYou manage an occupied office building with complaints
We survey the existing network floor by floor, identify why airflow is unbalanced across zones, and carry out corrections in phases without cutting cooling to neighbouring offices.
Ask on WhatsApp
What the job covers
What our scope covers
- Duct network design
- G90 sheet to SMACNA
- Zone layout and dampers
- Flexible connections and plenums
- Commissioning and air balancing
How we work
How we work
- 1
Survey and drawing review
We visit the site and review the architectural and structural drawings, fixing riser routes, plant room positions and floor penetrations in coordination with the project team.
- 2
Design and zone layout
We design the duct network, assign zones per floor and tenant, and set duct sizes, damper positions and plenum box locations for every branch.
- 3
Duct fabrication and installation
We fabricate ducts in our workshop from G90 galvanized sheet to SMACNA standards, insulate them with glass-wool, and install floor by floor in coordination with other contractors on site.
- 4
Balancing and handover
After start-up we balance airflow across all air outlets, verify each thermostat responds correctly, and hand the as-built drawings to the building management.
Why Alrabih?
Integrated design or unplanned expansion?
| Alrabih | The usual way | |
|---|---|---|
| Zone layout | Designed per floor and tenant | Estimated without design |
| Ductwork | Fabricated to calculated sizes | Random sizes used |
| Dampers | On every branch for control | Fitted where convenient |
| As-built record | Final drawings handed over | No record after handover |
| Riser insulation | Glass-wool stops condensation | Insulation skipped |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Sahifah is a central Jeddah district with multi-storey commercial and residential buildings undergoing rapid development, with multi-level streets. Dense construction and coastal proximity increase heat loads and humidity, whilst intersecting streets and obstacles demand precise calculations for team access and equipment delivery. Central cooling needs regular maintenance due to high loads and humid conditions.
Al Sahifah lies in central Jeddah's heart, a district of high-density multi-storey buildings under continuous development.
Office and residential towers here rely on high-capacity central cooling, with outdoor units on roofs or in street-screened locations.
The AC setup in Al Sahifah
- 1
High-capacity unified central system
Chillers are mounted in a central plant room, with pumps and separators distributing cold water throughout the building.
- 2
Vertical ducts distributed on building columns
Ducts run inside building columns or interior walls, glass-wool wrapped from ground floor to roof.
- 3
Distributed drain and monitoring points
Condensate drain points are fixed every few floors, with monitoring ports to test air flow and pressure.
Before the visit
Before our visit in Al Sahifah
- 1
Get precise plans for loads and spaces
Request from the owner and contractor detailed plans including areas, windows and expected occupancy, for accurate heat load calculation.
- 2
Coordinate with traffic and buildings to reserve space
Notify local authorities and building management of planned dates, requesting reserved safe space on the pavement or in the building yard.
- 3
Check access routes and roof safety
Inspect stairs, lifts and vertical passages, confirming roof strength and foundations that will support outdoor units.
More districts for Tower and office building HVAC
Other services in Al Sahifah
FAQ
Questions about Tower and office building HVAC
How does each tenant control their own temperature independently?
Each floor or zone is fed from its own plenum box, a damper controls the volume of air entering, and the thermostat sets the required temperature. This layout lets each tenant adjust their space without affecting the floors above or below.
Do tenant fit-out works affect cooling on other floors?
When the system is designed with independent zones, redistributing outlets or moving dampers inside one floor stays isolated from the rest of the building. We review the revised layout and rebalance that zone before the tenant moves in.
How does Jeddah's humidity affect duct design in towers?
High humidity means outdoor air carries a greater moisture load, which feeds into duct sizing and treated air volumes. Risers near the facade also need thorough glass-wool insulation to stop condensation forming on the duct surface inside the building.
Can you work while the building is occupied?
Yes, and that requires phasing the work floor by floor or wing by wing so cooling is never cut to neighbouring offices. We agree a programme with building management before starting and identify at the survey which sections can be isolated without disrupting daily operations.
How is cooling managed for the tower lobby and car park?
The lobby and car park have different requirements from office floors: ceiling heights differ, heat loads vary and ventilation needs change. The lobby needs diffusers suited to tall spaces, while the car park requires mechanical ventilation working alongside the cooling. The site survey determines the right design for each space.
Dense buildings in Al Sahifah increase heat loads, how do you calculate that?
We perform detailed load calculations including building volume, window area, occupancy density and office count, selecting chillers with adequate capacity.
Intersecting streets and obstacles complicate access, how do you plan?
We coordinate with traffic management and buildings to reserve safe work space, planning alternate routes for heavy equipment and long ducts.
Humidity and dense construction affect system efficiency, how do you maintain it?
We design ducts with thick glass-wool insulation to cut heat loss, and provide regular maintenance for cleaning chillers, filters and ducts.
If the building layout is very tight, is there an alternative?
We can deploy multiple smaller systems with full coordination, or mount outdoor units in non-traditional spots like protected walls or low roofs.