University HVAC in Al Ma'rifah, Jeddah

In Al Ma'rifah, north Jeddah, emerging educational projects need AC systems tailored to each building's role, from large lecture halls to specialist offices. Alrabih manages the building's thermal load efficiently through central systems with separate controls by function.

4.9 on Google
  • Hall fresh air
  • Zone control
  • Break scheduling

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When the campus needs a specialist

  1. 1

    Halls whose loads change fast

    A lecture hall goes from empty to full in minutes, and heat load and humidity jump suddenly. A system sized for a steady load cannot handle this swing, so the compressor labours or the air fails to reach the back rows.

  2. 2

    Many buildings and scattered systems

    A campus holds buildings with systems of different ages and types. Without coordination, energy use rises and maintenance becomes difficult. We assess what is there in the survey and propose the right solution building by building.

  3. 3

    Labs that need controlled air and pressure

    A lab needs enough fresh air to dilute fumes, and sometimes a pressure difference between it and the adjacent corridor. The right damper and a carefully designed plenum box are the basis of that control, and any error in them affects the safety of the space and the work done in it.

Who it's for

  • Building a new university block that needs HVAC design

    We design HVAC and ventilation for every hall and lab from scratch, supply ductwork and suitable equipment.

    Ask on WhatsApp
  • Existing HVAC systems failing to cool the lecture halls

    We survey each building, decide what to replace or repair, and complete all works during the term break.

    Ask on WhatsApp

What the job covers

What Alrabih's university work covers

  • Design per building
  • G90 duct to SMACNA
  • Dampers and plenum installation
  • Glass wool and Kingspan insulation
  • Thermostat setting per zone
Request a quote

How we work

How we work

  1. 1

    Campus survey

    We visit every building, note its area, existing system type, air openings and usage schedule, then set intervention priorities and timing before writing any specification.

  2. 2

    Design and specification

    We design the ductwork, dampers and plenum boxes for each building, select suitable equipment from our authorised brands, then present the plan to the university administration.

  3. 3

    Works during the break

    Major works such as replacing ductwork and fitting equipment are done in the inter-term break, scheduled with the university so each phase finishes before students return.

  4. 4

    Commissioning and handover

    We run each system, set the dampers and thermostat for every hall and lab, check that fresh air reaches the back of the halls, then hand the university's technical team the system documentation.

Start with step one

Why Alrabih?

Tailored design or one solution for all?

AlrabihThe usual way
Equipment sizingMatched to each building's loadSame size for every building
Fresh airCalculated for peak occupancyLeft to natural leakage
Hall controlThermostat per zoneOne switch for the building
Works timingScheduled in the term breakMid-term disruption
DuctworkWorkshop-fabricated to design dimensionsOff-the-shelf standard sizes
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Ma'rifah is growing rapidly with new projects occupying large areas, allowing flexibility in AC system planning. Modern buildings here have high construction standards, but summer thermal loads remain intense because of the inland location away from sea breezes. Efficient design needs good thermal insulation, high-capacity processing units, and precise control of airflow between different spaces. Being inland means less salt exposure and lower humidity than coastal northern areas.

Al Ma'rifah sits in the inland north, a district of new educational projects on large sites with modern building standards.

Modern Al Ma'rifah buildings choose central AC systems with high insulation and control standards, with high-capacity processing units to handle intense summer thermal loads.

The AC setup in Al Ma'rifah

  1. 1

    High-capacity central processing unit

    Intense thermal loads require a powerful processing unit, usually on the roof or in a well-ventilated dedicated mechanical space.

  2. 2

    High-standard thermal and glass-wool insulation

    Ducts and pipes need robust insulation to minimize heat and cooling loss, especially over long runs across large areas.

  3. 3

    Smart control with multiple distributors

    Control system allowing separate temperature and ventilation settings for each space or group of spaces based on actual use.

Before the visit

Before our visit in Al Ma'rifah

  1. 1

    Review architectural drawings and environmental standards

    Review complete plans and any environmental requirements or building standards that may affect AC system design.

  2. 2

    Confirm available space for unit and main duct

    Check that roof or mechanical space safely accommodates the processing unit and condensers, and passages allow main duct runs without obstacles.

  3. 3

    Get thermal load data from design engineers

    Ask design engineers for data on floor areas, use patterns and equipment to calculate thermal load accurately and choose correct unit size.

FAQ

Questions about University HVAC

How do you handle halls that fill and empty quickly?

We calculate the hall load at maximum occupancy and design the ductwork and plenum box to meet that peak, then fit controllable dampers so the system responds quickly to change. The right thermostat for each hall also helps hold a comfortable temperature when occupancy shifts suddenly.

Does Jeddah's coastal climate affect ventilation design?

Yes. Jeddah's high humidity means the fresh air entering large halls carries a heavy latent load. We include this in the design so the equipment can dehumidify adequately. The salt in the sea air also means outdoor units need materials and coatings suited to a coastal environment.

Do you make the ductwork on site or in your workshop?

We fabricate ductwork in our own workshop from G90 galvanized sheet to the designed dimensions, and also supply flexible duct connecting the main duct to the air outlets. Workshop fabrication improves dimensional accuracy and reduces time spent on the campus site.

Do you work on existing buildings that need their HVAC updated?

Yes. Many university buildings run on ageing equipment or corroded ductwork. We start with a careful survey of each building to decide what stays and what is replaced, then plan the work by building priority and term break dates so studies are not affected. The type of replacement equipment is decided by the surveyor after the site inspection.

Does a lab need a different air system from a lecture hall?

Usually yes. A lab needs enough fresh air to dilute fumes, and may need a pressure difference between it and the corridor. We set the exact requirement at the site survey according to the lab type and use, then adjust the dampers and design the air system to hold it steadily.

Summer heat load is intense in Al Ma'rifah, how do you choose the right unit size?

We measure spaces, orientations, windows and walls, calculate thermal load using international standards, then select a processing unit slightly above the calculated load to ensure comfort in peak conditions.

Do new Al Ma'rifah buildings need custom design?

Yes, each new building has distinct needs. We work with architects and contractors from the start to ensure the system integrates with structure and power runs.

Is humidity in Al Ma'rifah lower than coastal areas?

Yes, Al Ma'rifah is inland and away from coast, so humidity is lower. This reduces humidity control demand and allows more energy-efficient designs.

How long does regular maintenance of the central system take?

Maintenance depends on system size and use. Regular inspection of ducts, filters and the central unit varies with the job, and we confirm the time before we start.

The Jeddah corniche in cool weather

Start with a campus survey

Contact us on WhatsApp or by phone to arrange a survey of your buildings in Jeddah, Saturday to Thursday, 8 am to 8 pm.

CallWhatsApp