University HVAC in Al Sarawat, Jeddah
In Al Sarawat, south Jeddah, where multi-storey educational and administrative complexes stand, Alrabih designs central HVAC systems matched to each building's load and operating schedule.
4.9 on Google- Hall fresh air
- Zone control
- Break scheduling
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When the campus needs a specialist
- 1
Halls whose loads change fast
A lecture hall goes from empty to full in minutes, and heat load and humidity jump suddenly. A system sized for a steady load cannot handle this swing, so the compressor labours or the air fails to reach the back rows.
- 2
Many buildings and scattered systems
A campus holds buildings with systems of different ages and types. Without coordination, energy use rises and maintenance becomes difficult. We assess what is there in the survey and propose the right solution building by building.
- 3
Labs that need controlled air and pressure
A lab needs enough fresh air to dilute fumes, and sometimes a pressure difference between it and the adjacent corridor. The right damper and a carefully designed plenum box are the basis of that control, and any error in them affects the safety of the space and the work done in it.
Who it's for
Building a new university block that needs HVAC design
We design HVAC and ventilation for every hall and lab from scratch, supply ductwork and suitable equipment.
Ask on WhatsAppExisting HVAC systems failing to cool the lecture halls
We survey each building, decide what to replace or repair, and complete all works during the term break.
Ask on WhatsApp
What the job covers
What Alrabih's university work covers
- Design per building
- G90 duct to SMACNA
- Dampers and plenum installation
- Glass wool and Kingspan insulation
- Thermostat setting per zone
How we work
How we work
- 1
Campus survey
We visit every building, note its area, existing system type, air openings and usage schedule, then set intervention priorities and timing before writing any specification.
- 2
Design and specification
We design the ductwork, dampers and plenum boxes for each building, select suitable equipment from our authorised brands, then present the plan to the university administration.
- 3
Works during the break
Major works such as replacing ductwork and fitting equipment are done in the inter-term break, scheduled with the university so each phase finishes before students return.
- 4
Commissioning and handover
We run each system, set the dampers and thermostat for every hall and lab, check that fresh air reaches the back of the halls, then hand the university's technical team the system documentation.
Why Alrabih?
Tailored design or one solution for all?
| Alrabih | The usual way | |
|---|---|---|
| Equipment sizing | Matched to each building's load | Same size for every building |
| Fresh air | Calculated for peak occupancy | Left to natural leakage |
| Hall control | Thermostat per zone | One switch for the building |
| Works timing | Scheduled in the term break | Mid-term disruption |
| Ductwork | Workshop-fabricated to design dimensions | Off-the-shelf standard sizes |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Sarawat's buildings mix administrative towers, training centres and office blocks, where thermal loads differ sharply between lecture halls, storage areas and office zones. Design must account for high humidity and salty coastal air, and major works need coordination with building management to run during shut-down periods.
Al Sarawat is a southern district with medium-rise administrative and commercial buildings and relatively modern office towers.
Most modern buildings here use central HVAC with plenum boxes and main distribution ducts running through the floors.
The AC setup in Al Sarawat
- 1
Central ducts from the roof plant
Administrative towers usually mount the main cooling units on the roof, with plenum boxes and primary ducts running down through the core or internal walls to serve the floors.
- 2
Air outlets in ceilings and walls
Cooled air is distributed through outlets set in suspended ceilings in lecture halls and offices, with visible diffusers and precise balancing.
- 3
Flexible ducts and thermal insulation
Flexible ducts connect the main runs to smaller branches, and glass-wool insulation maintains air temperature and reduces noise in quiet spaces.
Before the visit
Before our visit in Al Sarawat
- 1
Confirm heavy equipment access routes
Check that doors, corridors and service lifts can accommodate the large units, pipes and ducts before work begins.
- 2
Schedule with building management for the approved period
Tell us about planned holidays or shut-down periods, which areas will be closed during work, and which staff members have on-site authority.
- 3
Provide roof and plant room space
Ensure the roof and equipment areas are clear of obstacles and safe for work, and that drainage and power supply are available as planned.
More districts for University HVAC
Other services in Al Sarawat
FAQ
Questions about University HVAC
How do you handle halls that fill and empty quickly?
We calculate the hall load at maximum occupancy and design the ductwork and plenum box to meet that peak, then fit controllable dampers so the system responds quickly to change. The right thermostat for each hall also helps hold a comfortable temperature when occupancy shifts suddenly.
Does Jeddah's coastal climate affect ventilation design?
Yes. Jeddah's high humidity means the fresh air entering large halls carries a heavy latent load. We include this in the design so the equipment can dehumidify adequately. The salt in the sea air also means outdoor units need materials and coatings suited to a coastal environment.
Do you make the ductwork on site or in your workshop?
We fabricate ductwork in our own workshop from G90 galvanized sheet to the designed dimensions, and also supply flexible duct connecting the main duct to the air outlets. Workshop fabrication improves dimensional accuracy and reduces time spent on the campus site.
Do you work on existing buildings that need their HVAC updated?
Yes. Many university buildings run on ageing equipment or corroded ductwork. We start with a careful survey of each building to decide what stays and what is replaced, then plan the work by building priority and term break dates so studies are not affected. The type of replacement equipment is decided by the surveyor after the site inspection.
Does a lab need a different air system from a lecture hall?
Usually yes. A lab needs enough fresh air to dilute fumes, and may need a pressure difference between it and the corridor. We set the exact requirement at the site survey according to the lab type and use, then adjust the dampers and design the air system to hold it steadily.
An administrative building with lecture halls and offices, how does the design differ?
Lecture halls need higher cooling capacity and continuous ventilation when occupied, whereas empty offices may run at reduced load. We design with manual or automatic air dampers in the ducts to redirect flow as demand changes.
Al Sarawat's streets are wide, but roof or chiller access can be complicated, what should we plan?
We confirm access points, the dedicated worker lift and permitted roof areas in advance. Enabling machinery or fork-lift access for heavy equipment movement reduces installation time.
Humidity and salt air near the coast, do they affect the ducts and insulation?
Glass-wool insulation and galvanized ducts resist humidity, but metal surfaces and joints need periodic checks to avoid corrosion. We select salt-resistant materials where the design requires it.
When can major HVAC works run in a busy administrative building?
We agree with building management on times that do not disrupt operations, such as holidays or extended weekends, and schedule the work to minimise downtime.


























































































