University HVAC in Madain Al Fahd, Jeddah
In Madain Al Fahd, south Jeddah, rapid urban development brings diverse buildings needing modern, scalable HVAC systems. Alrabih designs the system to handle high heat and humidity while adapting to the area's growth.
4.9 on Google- Hall fresh air
- Zone control
- Break scheduling
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When the campus needs a specialist
- 1
Halls whose loads change fast
A lecture hall goes from empty to full in minutes, and heat load and humidity jump suddenly. A system sized for a steady load cannot handle this swing, so the compressor labours or the air fails to reach the back rows.
- 2
Many buildings and scattered systems
A campus holds buildings with systems of different ages and types. Without coordination, energy use rises and maintenance becomes difficult. We assess what is there in the survey and propose the right solution building by building.
- 3
Labs that need controlled air and pressure
A lab needs enough fresh air to dilute fumes, and sometimes a pressure difference between it and the adjacent corridor. The right damper and a carefully designed plenum box are the basis of that control, and any error in them affects the safety of the space and the work done in it.
Who it's for
Building a new university block that needs HVAC design
We design HVAC and ventilation for every hall and lab from scratch, supply ductwork and suitable equipment.
Ask on WhatsAppExisting HVAC systems failing to cool the lecture halls
We survey each building, decide what to replace or repair, and complete all works during the term break.
Ask on WhatsApp
What the job covers
What Alrabih's university work covers
- Design per building
- G90 duct to SMACNA
- Dampers and plenum installation
- Glass wool and Kingspan insulation
- Thermostat setting per zone
How we work
How we work
- 1
Campus survey
We visit every building, note its area, existing system type, air openings and usage schedule, then set intervention priorities and timing before writing any specification.
- 2
Design and specification
We design the ductwork, dampers and plenum boxes for each building, select suitable equipment from our authorised brands, then present the plan to the university administration.
- 3
Works during the break
Major works such as replacing ductwork and fitting equipment are done in the inter-term break, scheduled with the university so each phase finishes before students return.
- 4
Commissioning and handover
We run each system, set the dampers and thermostat for every hall and lab, check that fresh air reaches the back of the halls, then hand the university's technical team the system documentation.
Why Alrabih?
Tailored design or one solution for all?
| Alrabih | The usual way | |
|---|---|---|
| Equipment sizing | Matched to each building's load | Same size for every building |
| Fresh air | Calculated for peak occupancy | Left to natural leakage |
| Hall control | Thermostat per zone | One switch for the building |
| Works timing | Scheduled in the term break | Mid-term disruption |
| Ductwork | Workshop-fabricated to design dimensions | Off-the-shelf standard sizes |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Madain Al Fahd is a modern expansion area with rapid building pace, so you find new residential towers, large administrative and commercial buildings, and expanded service complexes. New buildings feature modern designs that allow flexible duct and equipment runs, with regular roofs suited to outdoor unit mounting. However, building pace means some systems may need later expansion or adjustment, so flexible design allowing addition and maintenance without full rebuild is vital.
Madain Al Fahd lies in south Jeddah's rapid development zone, mixing modern residential, commercial and administrative buildings.
Most new buildings here use large central HVAC systems with powerful units and organised air distribution via metal ductwork and multiple outlets.
The AC setup in Madain Al Fahd
- 1
Central HVAC with powerful units
Towers and large buildings need high-capacity central units mounted in plant rooms on the roof or basement level.
- 2
Organised air distribution via metal ducts
An orderly network of metal ducts distributes air from central units to all floors and zones.
- 3
Separate control per zone with thermostats and dampers
Each floor or work zone has its own thermostat and dampers to control temperature to its needs.
Before the visit
Before our visit in Madain Al Fahd
- 1
Get building plans and expected heat load
Building drawings and planned use are essential to calculate actual cooling load and select equipment accurately.
- 2
Confirm equipment access and available space
Ensure a plant room or suitable roof location is available for mounting central equipment and outdoor units.
- 3
Schedule execution with building timeline
Coordinate with contractors and site supervisors to run HVAC works in parallel with other phases without delay.
More districts for University HVAC
Other services in Madain Al Fahd
FAQ
Questions about University HVAC
How do you handle halls that fill and empty quickly?
We calculate the hall load at maximum occupancy and design the ductwork and plenum box to meet that peak, then fit controllable dampers so the system responds quickly to change. The right thermostat for each hall also helps hold a comfortable temperature when occupancy shifts suddenly.
Does Jeddah's coastal climate affect ventilation design?
Yes. Jeddah's high humidity means the fresh air entering large halls carries a heavy latent load. We include this in the design so the equipment can dehumidify adequately. The salt in the sea air also means outdoor units need materials and coatings suited to a coastal environment.
Do you make the ductwork on site or in your workshop?
We fabricate ductwork in our own workshop from G90 galvanized sheet to the designed dimensions, and also supply flexible duct connecting the main duct to the air outlets. Workshop fabrication improves dimensional accuracy and reduces time spent on the campus site.
Do you work on existing buildings that need their HVAC updated?
Yes. Many university buildings run on ageing equipment or corroded ductwork. We start with a careful survey of each building to decide what stays and what is replaced, then plan the work by building priority and term break dates so studies are not affected. The type of replacement equipment is decided by the surveyor after the site inspection.
Does a lab need a different air system from a lecture hall?
Usually yes. A lab needs enough fresh air to dilute fumes, and may need a pressure difference between it and the corridor. We set the exact requirement at the site survey according to the lab type and use, then adjust the dampers and design the air system to hold it steadily.
New buildings here are very large, how do you design HVAC for them?
We study the building's actual cooling load, select powerful central units, and distribute air via organised ductwork with thermostats and dampers per zone.
Fast building pace may mean later expansions, is your system flexible?
We design the system with spare capacity and select equipment and distribution lines that can be added to or modified, avoiding full rebuild when expanding.
Heat, humidity and coastal salt together, is this extra load?
Yes, this increases condenser and filter load, so we choose powerful equipment, upsize condensers and filters, and clean regularly.
When do major works and full maintenance begin?
During construction or before building opening, we coordinate with contractors and management to carry out all works in parallel without delaying the opening.