University HVAC in North Corniche, Jeddah

On the North Corniche, hotels, tourism projects and commercial buildings rely on central HVAC systems capable of operating efficiently under high sea humidity and salt in the air. Alrabih designs and implements systems tailored to this harsh coastal setting.

4.9 on Google
  • Hall fresh air
  • Zone control
  • Break scheduling

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When the campus needs a specialist

  1. 1

    Halls whose loads change fast

    A lecture hall goes from empty to full in minutes, and heat load and humidity jump suddenly. A system sized for a steady load cannot handle this swing, so the compressor labours or the air fails to reach the back rows.

  2. 2

    Many buildings and scattered systems

    A campus holds buildings with systems of different ages and types. Without coordination, energy use rises and maintenance becomes difficult. We assess what is there in the survey and propose the right solution building by building.

  3. 3

    Labs that need controlled air and pressure

    A lab needs enough fresh air to dilute fumes, and sometimes a pressure difference between it and the adjacent corridor. The right damper and a carefully designed plenum box are the basis of that control, and any error in them affects the safety of the space and the work done in it.

Who it's for

  • Building a new university block that needs HVAC design

    We design HVAC and ventilation for every hall and lab from scratch, supply ductwork and suitable equipment.

    Ask on WhatsApp
  • Existing HVAC systems failing to cool the lecture halls

    We survey each building, decide what to replace or repair, and complete all works during the term break.

    Ask on WhatsApp

What the job covers

What Alrabih's university work covers

  • Design per building
  • G90 duct to SMACNA
  • Dampers and plenum installation
  • Glass wool and Kingspan insulation
  • Thermostat setting per zone
Request a quote

How we work

How we work

  1. 1

    Campus survey

    We visit every building, note its area, existing system type, air openings and usage schedule, then set intervention priorities and timing before writing any specification.

  2. 2

    Design and specification

    We design the ductwork, dampers and plenum boxes for each building, select suitable equipment from our authorised brands, then present the plan to the university administration.

  3. 3

    Works during the break

    Major works such as replacing ductwork and fitting equipment are done in the inter-term break, scheduled with the university so each phase finishes before students return.

  4. 4

    Commissioning and handover

    We run each system, set the dampers and thermostat for every hall and lab, check that fresh air reaches the back of the halls, then hand the university's technical team the system documentation.

Start with step one

Why Alrabih?

Tailored design or one solution for all?

AlrabihThe usual way
Equipment sizingMatched to each building's loadSame size for every building
Fresh airCalculated for peak occupancyLeft to natural leakage
Hall controlThermostat per zoneOne switch for the building
Works timingScheduled in the term breakMid-term disruption
DuctworkWorkshop-fabricated to design dimensionsOff-the-shelf standard sizes
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

The North Corniche hosts large hotels, commercial and tourism projects with tall residential towers and spacious hotel compounds. These buildings experience stress from daily thermal expansion and contraction, and sea salt affects all exposed metals and wiring. HVAC here needs precise calibration to handle varying guest loads and high humidity, and equipment and pipes must be specifically designed to withstand salt and moisture.

The North Corniche on Jeddah's waterfront is an area of tall, spacious hotel and commercial buildings directly facing the sea.

Hotel and commercial buildings on the Corniche need central HVAC to high standards of efficiency and reliability because of year-round intensive operation and extreme humidity.

The AC setup in North Corniche

  1. 1

    Large central system with isolated mechanical room

    Hotels on the Corniche typically need a large, well-ventilated, isolated mechanical room to house heavy equipment and main pipes.

  2. 2

    Ducts insulated with heavy salt-resistant material

    Ducts on the Corniche use very heavy glass-wool insulation to protect the moving air inside from salt and humidity from outside.

  3. 3

    Outdoor units mounted high on roofs

    Outdoor units in tall Corniche buildings are mounted on top roofs as far as possible from direct sea spray.

Before the visit

Before our visit in North Corniche

  1. 1

    Inspect available space for the mechanical room

    Confirm that the planned mechanical room is large enough to accommodate main equipment and future maintenance easily.

  2. 2

    Agree on outdoor unit placement locations

    Specify the roof or facade location or locations for outdoor units, ensuring all sites are safe and unobstructed.

  3. 3

    Schedule work to avoid operational disruption

    Agree on installation and testing times that do not clash with the hotel's or commercial complex's main operating hours.

FAQ

Questions about University HVAC

How do you handle halls that fill and empty quickly?

We calculate the hall load at maximum occupancy and design the ductwork and plenum box to meet that peak, then fit controllable dampers so the system responds quickly to change. The right thermostat for each hall also helps hold a comfortable temperature when occupancy shifts suddenly.

Does Jeddah's coastal climate affect ventilation design?

Yes. Jeddah's high humidity means the fresh air entering large halls carries a heavy latent load. We include this in the design so the equipment can dehumidify adequately. The salt in the sea air also means outdoor units need materials and coatings suited to a coastal environment.

Do you make the ductwork on site or in your workshop?

We fabricate ductwork in our own workshop from G90 galvanized sheet to the designed dimensions, and also supply flexible duct connecting the main duct to the air outlets. Workshop fabrication improves dimensional accuracy and reduces time spent on the campus site.

Do you work on existing buildings that need their HVAC updated?

Yes. Many university buildings run on ageing equipment or corroded ductwork. We start with a careful survey of each building to decide what stays and what is replaced, then plan the work by building priority and term break dates so studies are not affected. The type of replacement equipment is decided by the surveyor after the site inspection.

Does a lab need a different air system from a lecture hall?

Usually yes. A lab needs enough fresh air to dilute fumes, and may need a pressure difference between it and the corridor. We set the exact requirement at the site survey according to the lab type and use, then adjust the dampers and design the air system to hold it steadily.

How do you handle salt and humidity in tall hotel towers?

We select salt and humidity-resistant materials, including high-quality copper pipes and thick glass-wool insulation. We test all connections carefully and ensure all openings and covers are sealed to prevent salt and moisture entry.

The hotel runs all year with varying guest numbers, how does the system adapt?

We design the system with high flexibility using multiple units and adjustable air dampers so only occupied areas run while vacant sections shut down. This saves electricity and ensures comfort matching actual occupancy.

Corniche projects are very large, can you install the system in phases?

Yes, we divide large projects into separate phases so each phase can operate once complete without waiting for the whole project. This lets you open hotel or compound sections to clients on schedule.

How do you test the HVAC system after installation in a large hotel building?

We test the whole system before final operation, including checking air pressure and flow in each section and confirming all connections and insulation are sound. We coordinate with the hotel to ensure testing does not disrupt operations.

The Jeddah corniche in cool weather

Start with a campus survey

Contact us on WhatsApp or by phone to arrange a survey of your buildings in Jeddah, Saturday to Thursday, 8 am to 8 pm.

CallWhatsApp