Ventilation and exhaust systems in Al Buhayrat, Jeddah

In Al Buhayrat, north of Jeddah, modern residential buildings and offices need proper ventilation to improve indoor air quality. Alrabih supplies air ducts in G90 galvanized sheet with balanced dampers to distribute fresh air and remove stale air efficiently.

4.9 on Google
  • Effective exhaust
  • Balanced flow
  • Fresh air in

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When you need a dedicated ventilation system

  1. 1

    Smell or moisture that does not clear

    In a commercial kitchen, laundry or toilet block, steam and smells build up because stale air has nowhere to go. A properly designed exhaust system removes them at the source rather than just recirculating heavy air around the space.

  2. 2

    A plant room or workshop that overheats

    Electrical equipment and motors generate heat that shortens their life if it stays trapped. Mechanical ventilation draws hot air out from the top and brings cooler air in at a chosen point, keeping the operating temperature within a safe range.

  3. 3

    A car park or crowded prayer hall

    Exhaust fumes in enclosed car parks and carbon dioxide in large halls cannot be handled by cooling alone. The right system depends on the space and layout, and we plan the duct route and intake and exhaust points after a site survey.

Who it's for

  • Running a commercial kitchen with persistent steam and smells

    We survey the kitchen, design an exhaust system with galvanized duct and balancing dampers that remove steam and smells at the source, and bring fresh air in from a separate intake point.

    Ask on WhatsApp
  • Building a warehouse or workshop that needs mechanical ventilation

    We design the duct route and intake and exhaust positions during the construction phase, so the network is installed in the right place before ceilings and walls are finished.

    Ask on WhatsApp

What the job covers

What the installation covers

  • G90 galvanised sheet ducts
  • dampers for flow balancing
  • flexible connections at fans
  • separate intake and exhaust points
  • ducts insulated with glass wool
Request a quote

How we work

How we work

  1. 1

    Site survey and requirements

    We visit the site and note heat sources, smells, moisture and available duct routes, then fix intake and exhaust points so that expelled air cannot be drawn back into the building.

  2. 2

    System and route design

    We draw the duct route, damper and fan positions, and confirm that every space receives its share of air as the site demands.

  3. 3

    Duct fabrication and installation

    We fabricate the duct in our workshop from G90 galvanized sheet from SABIC to the site dimensions, then hang, insulate and connect it with flexible duct at the fans to reduce vibration.

  4. 4

    Balancing and handover

    After installation we adjust the dampers until flow is distributed at the right proportion through each outlet, then hand over the system with a one-year warranty.

Start with step one

Why Alrabih?

A designed system or just a hanging fan?

AlrabihThe usual way
Intake and exhaust pointsSeparate and positioned carefullyUncoordinated, exhaust re-enters
Flow distributionDampers balance every spaceSome spaces starved, others overloaded
DuctworkG90 galvanized sheet from SABICMixed or makeshift materials
Make-up airAccounted for in the designIgnored so fans lose pressure
Duct insulationGlass wool fitted carefullySkipped so moisture condenses
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Buhayrat is a relatively modern district with mid-rise residential buildings, offices and some retail shops, and its buildings were designed to require regular ventilation. Design must account for humid coastal air and salt near the shore, balancing fresh and exhaust air in each flat or office. Available ceiling space allows organised duct installation without complex modifications.

Al Buhayrat sits at Jeddah's far north, a district of modern residential and commercial buildings with regular architectural spacing.

Most residential buildings here need ventilation ducts in false ceilings with outlets distributed across bathrooms, kitchens and corridors.

The AC setup in Al Buhayrat

  1. 1

    Central ventilation for residential towers

    Mid-rise residential towers need vertical ventilation ducts from the ground floor to the roof with a plenum box in an intermediate plant room.

  2. 2

    Separate ventilation per residential unit

    Each flat needs independent ventilation systems controlled separately, with outlets in the bathroom, kitchen and corridors.

  3. 3

    Office and retail ventilation

    Offices and retail shops on ground floors need simple ventilation systems with horizontal ducts below false ceilings.

Before the visit

Before our visit in Al Buhayrat

  1. 1

    Check false-ceiling plans

    Obtain detailed drawings of false ceilings, their heights and available space for air ducts before the visit.

  2. 2

    Locate outlets and return-air points

    Clarify with the contractor and designer the locations of air outlets and spaces reserved for return-air intake from residential units.

  3. 3

    Coordinate with building management

    Agree with building management on working times and which areas will be closed during work to avoid disturbing residents.

FAQ

Questions about Ventilation and exhaust systems

Does Jeddah's salty air affect ventilation ductwork?

Yes, Jeddah's humid, salt-laden air accelerates corrosion in low-grade sheet. We use G90 galvanized sheet from SABIC whose zinc coating resists the moisture and salinity. Outdoor intake points are positioned after the survey to avoid direct exposure to sea winds.

Can ventilation be added to an existing building without demolition?

In many cases yes. At the survey we check the space above false ceilings and possible routes through service areas. Some buildings allow a full run; others need alternative routes that we explain before work starts. The site decides.

What is the difference between natural and mechanical ventilation?

Natural ventilation relies on pressure differences, heat and facade openings, and it weakens on the hot, humid days that are common in Jeddah. Mechanical ventilation uses fans and duct that work regardless of weather, making it the right choice for kitchens, car parks and plant rooms.

Do you install ventilation systems in large and government projects?

Yes, we work on residential, commercial, industrial and government buildings across all districts of Jeddah. Project size affects pricing: we offer discounts by quantity and project size, and competitive prices across all works. Contact us with your project details and we will arrange a survey.

How do you make sure expelled air does not re-enter the building?

At the survey we note the prevailing wind direction and the positions of nearby openings, then separate the intake point from the exhaust point by a suitable distance and height. That separation is what prevents expelled air from circulating back into the space, and the conditions at each site decide the right arrangement.

How do you handle ventilation in small and medium-sized flats?

We design relatively simple ventilation ducts with a small plenum box serving multiple outlets, using dampers to balance distribution to each bathroom and kitchen according to the flat's needs.

Al Buhayrat streets are wide, is material access easy?

Yes, the wide streets and open spaces in Al Buhayrat allow material trucks and equipment to access the main building entrance directly.

Does salt and humidity near the shore affect galvanized sheet quality?

The humid coastal air and salt require extra protection for G90 galvanized sheet during storage, and we recommend applying an additional protective coating to exposed joints and cut edges.

Do modern buildings in Al Buhayrat need specific ventilation standards?

Yes, modern buildings need specific periodic ventilation standards, and we confirm these with the designer and contractor beforehand to ensure the system meets building requirements.

The Jeddah corniche in cool weather

Start with a site survey

Send us a description of the space you need ventilated on WhatsApp or call us, and we will book a survey visit Saturday to Thursday, 8 am to 8 pm.

CallWhatsApp