Ventilation and exhaust systems in Al Rabiyah, Jeddah
In Al Rabiyah in south Jeddah, warehouses, industrial workshops and factories need deep ventilation to remove heat, dust and process fumes. Alrabih installs ventilation and exhaust systems from G90 galvanized sheet with precise damper balancing for effective air pull.
4.9 on Google- Effective exhaust
- Balanced flow
- Fresh air in
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When you need a dedicated ventilation system
- 1
Smell or moisture that does not clear
In a commercial kitchen, laundry or toilet block, steam and smells build up because stale air has nowhere to go. A properly designed exhaust system removes them at the source rather than just recirculating heavy air around the space.
- 2
A plant room or workshop that overheats
Electrical equipment and motors generate heat that shortens their life if it stays trapped. Mechanical ventilation draws hot air out from the top and brings cooler air in at a chosen point, keeping the operating temperature within a safe range.
- 3
A car park or crowded prayer hall
Exhaust fumes in enclosed car parks and carbon dioxide in large halls cannot be handled by cooling alone. The right system depends on the space and layout, and we plan the duct route and intake and exhaust points after a site survey.
Who it's for
Running a commercial kitchen with persistent steam and smells
We survey the kitchen, design an exhaust system with galvanized duct and balancing dampers that remove steam and smells at the source, and bring fresh air in from a separate intake point.
Ask on WhatsAppBuilding a warehouse or workshop that needs mechanical ventilation
We design the duct route and intake and exhaust positions during the construction phase, so the network is installed in the right place before ceilings and walls are finished.
Ask on WhatsApp
What the job covers
What the installation covers
- G90 galvanised sheet ducts
- dampers for flow balancing
- flexible connections at fans
- separate intake and exhaust points
- ducts insulated with glass wool
How we work
How we work
- 1
Site survey and requirements
We visit the site and note heat sources, smells, moisture and available duct routes, then fix intake and exhaust points so that expelled air cannot be drawn back into the building.
- 2
System and route design
We draw the duct route, damper and fan positions, and confirm that every space receives its share of air as the site demands.
- 3
Duct fabrication and installation
We fabricate the duct in our workshop from G90 galvanized sheet from SABIC to the site dimensions, then hang, insulate and connect it with flexible duct at the fans to reduce vibration.
- 4
Balancing and handover
After installation we adjust the dampers until flow is distributed at the right proportion through each outlet, then hand over the system with a one-year warranty.
Why Alrabih?
A designed system or just a hanging fan?
| Alrabih | The usual way | |
|---|---|---|
| Intake and exhaust points | Separate and positioned carefully | Uncoordinated, exhaust re-enters |
| Flow distribution | Dampers balance every space | Some spaces starved, others overloaded |
| Ductwork | G90 galvanized sheet from SABIC | Mixed or makeshift materials |
| Make-up air | Accounted for in the design | Ignored so fans lose pressure |
| Duct insulation | Glass wool fitted carefully | Skipped so moisture condenses |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we've completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewService areas
We come to you anywhere in Jeddah
From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

What sets this district apart
Al Rabiyah is a large industrial zone with big warehouses, metal and assembly workshops and mid-size factories, where buildings typically have high ceilings and open floor plans. Ventilation systems here need long, wide ducts to distribute fresh, cool air across vast spaces, and coordinating installation with factory management is essential because work may continue during the fit. Industrial dust and intense heat increase the load on filters and insulation, requiring heavy-gauge G90 galvanized sheet that resists corrosion.
Al Rabiyah sits in south Jeddah's expanded industrial belt, a district of warehouses, metal workshops and factories with broad-based buildings.
Most warehouses and industrial workshops in Al Rabiyah use long horizontal ductwork connected to powerful roof-mounted fans to pull out hot and contaminated air.
The AC setup in Al Rabiyah
- 1
Long horizontal duct runs at ceiling height
Ducts run the length of the warehouse just below the ceiling and branch to multiple distribution points to pull hot air from work zones.
- 2
Air dampers at branch points
Air dampers balance flow between different workshop sections so heat and dust do not accumulate in any single area.
- 3
Filters and collection inlets at base level
Dust and heavy particles are collected at one point near floor level, making regular cleaning and maintenance straightforward.
Before the visit
Before our visit in Al Rabiyah
- 1
Bring warehouse layout and machine locations
Provide a precise map of machine locations, high-heat areas and contaminating processes so we can design the exact duct paths.
- 2
Confirm roof access and check electrical runs
Check that safe ladders reach the roof and locate existing electrical cables and pipes to avoid collisions.
- 3
Agree the installation schedule with workshop management
Identify time windows when our team can work without disrupting production lines or industrial safety.
More districts for Ventilation and exhaust systems
Other services in Al Rabiyah
FAQ
Questions about Ventilation and exhaust systems
Does Jeddah's salty air affect ventilation ductwork?
Yes, Jeddah's humid, salt-laden air accelerates corrosion in low-grade sheet. We use G90 galvanized sheet from SABIC whose zinc coating resists the moisture and salinity. Outdoor intake points are positioned after the survey to avoid direct exposure to sea winds.
Can ventilation be added to an existing building without demolition?
In many cases yes. At the survey we check the space above false ceilings and possible routes through service areas. Some buildings allow a full run; others need alternative routes that we explain before work starts. The site decides.
What is the difference between natural and mechanical ventilation?
Natural ventilation relies on pressure differences, heat and facade openings, and it weakens on the hot, humid days that are common in Jeddah. Mechanical ventilation uses fans and duct that work regardless of weather, making it the right choice for kitchens, car parks and plant rooms.
Do you install ventilation systems in large and government projects?
Yes, we work on residential, commercial, industrial and government buildings across all districts of Jeddah. Project size affects pricing: we offer discounts by quantity and project size, and competitive prices across all works. Contact us with your project details and we will arrange a survey.
How do you make sure expelled air does not re-enter the building?
At the survey we note the prevailing wind direction and the positions of nearby openings, then separate the intake point from the exhaust point by a suitable distance and height. That separation is what prevents expelled air from circulating back into the space, and the conditions at each site decide the right arrangement.
What duct width is needed for a large warehouse in Al Rabiyah?
It depends on the warehouse size, number of work zones and intensity of heat and dust. We survey the space and calculate distribution to ensure even ventilation in all areas.
Does industrial dust in Al Rabiyah build up in the duct quickly?
Yes, metal dust and powders accumulate quickly, which is why we design ducts with a gentle slope to drain moisture and heavy particles toward a collection point.
Can you install duct while the workshop is operating?
Yes, we coordinate with management to fit sections in sequence without disrupting production, and may use flexible duct runs in sensitive areas.
Does galvanized sheet need extra protection from dust and salt air?
G90 galvanized sheet is corrosion-resistant by nature, but we ensure condensation and moisture drain with inner insulation and small vent openings to prevent moisture trapping.


























































































