Chiller & AHU installation in Makkah, Makkah Region
Chiller and AHU installation in Makkah serves large hotels and massive residential buildings in this holy city. We are based in Jeddah: we install your units in a plant room or on the roof, commission the system and test it fully before handover.
4.9 on Google- Vibration isolation
- Aluminium cladding
- Full commissioning
Clients We're Proud to Serve
Organisations and companies that trusted Alrabih with their projects.
Is it for you?
When you need this installation
- 1
A new commercial or government building
The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.
- 2
An existing unit vibrates and makes noise
Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.
- 3
Extending an existing building
Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.
Who it's for
Building a hospital or hotel that needs a central cooling plant
We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.
Ask on WhatsAppReplaced an old chiller but connections do not match
We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.
Ask on WhatsApp
What the job covers
What the installation covers
- Chiller lifted onto isolated base
- Chilled pipework run and insulated
- Aluminium cladding of pipework
- AHUs mounted and duct-connected
- Pressure test and commissioning
How we work
How we work
- 1
Site survey and design
We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.
- 2
Base preparation and lifting
We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.
- 3
Pipework and ductwork
We run the chilled water pipes, insulate them and clad them in aluminium sheet to keep the insulation effective according to the building's conditions and its city's climate, then connect each AHU to its duct network.
- 4
Pressure test and commissioning
We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.
Why Alrabih?
Considered installation or a rushed one?
| Alrabih | The usual way | |
|---|---|---|
| Chiller base | Isolators matched to the site | Bolted straight to concrete |
| Pipe insulation | Full insulation with aluminium cladding | Partial or left bare |
| Pipe test | Pressure test before start-up | Started without testing |
| Air balancing | Measured and dampers adjusted | Unbalanced airflow |
| Transition pieces | Fabricated in our own workshop | Improvised or ill-fitting |
Everything your AC needs, from one team
From system design and duct fabrication to installation, commissioning and maintenance.

Split AC installation
Request this service
Duct installation
Request this service
Central AC installation
Request this service
Duct fabrication
Request this service
Cold room installation
Request this service
Electro-mechanical works
Request this service
Chiller & AHU installation
Request this service
HVAC design
Request this service
Copper piping works
Request this service
Air outlets and grilles installation
Request this service
Ventilation and exhaust systems
Request this service
HVAC controls and automation
Request this service
Duct insulation
Request this service
AC repair & faults
Request this service
AC cleaning
Request this service
Refrigerant charging
Request this service
Central AC maintenance
Request this service
Chiller maintenance
Request this service
AC removal & refitting
Request this service
Duct cleaning & sanitising
Request this service
AC servicing by brand
Request this service
Operation & maintenance contracts
Request this service
AHU maintenance
Request this service
Testing and commissioning
Request this service
Fridge & freezer service
Request this service
Cold rooms
Request this service
Display fridges & chillers
Request this service
Factory HVAC
Request this service
Warehouse HVAC
Request this service
Villa & home HVAC
Request this service
Hotel HVAC
Request this service
School HVAC
Request this service
Hospital HVAC
Request this service
Mosque HVAC
Request this service
Mall & retail HVAC
Request this service
Restaurant & cafe HVAC
Request this service
Government building HVAC
Request this service
Sports club HVAC
Request this service
Tower and office building HVAC
Request this service
University HVAC
Request this service
G90 galvanized steel and aluminium sheets
Request this service
Mueller and Lawton copper pipes
Request this service
Air grilles and diffusers (Saudi-made)
Request this service
Central AC accessories and materials
Request this service
Some of our work
Ductwork, rooftop units and diffusers, from work we have completed.
Customer reviews
What our customers say
- Waleed Daadouch
“The nicest treatment from the showroom team, and their prices are very competitive.”
Translated from Arabic
- Muhammadramzan 2641
“MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”
- RHAM rhamLocal Guide
“May God grant them success. Refined and respectful treatment.”
Translated from Arabic
- shahzeb armani
“Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”
- Shakeel Ahmed
“Nice experience very cooperative. Nice conducting with all customers”
- Tawfik AlyawerLocal Guide
“U can find all u need for air conditioning”
Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.
Worked with us? Leave a reviewWhere we work
Chiller & AHU installation in cities near Makkah
We are based in Jeddah, and we supply duct and install across the Kingdom. All our services in Makkah
What sets this city apart
Makkah is densely built with massive hotels and tall residential and service towers receiving pilgrims and visitors throughout the year. Large hotels need powerful chillers and multiple AHUs on each floor, with chilled water pipes running vertically in full insulation. The high building density demands precision in locating the chiller and plant room, and commissioning verifies pressure balance and distribution across all units.
Makkah is a holy city in a valley surrounded by rugged granite mountains, with a hot dry climate most of the year. It has dense high-rise hotels, residential and service towers.
Makkah's massive hotels typically rise many floors, requiring either one large chiller or multiple chillers with AHUs distributed across all levels.
The AC setup in Makkah
- 1
Roof chiller with multiple vertical runs
The chiller sits on the hotel roof, and chilled water pipes run vertically through the many floors, each insulated and positioned to the approved drawings.
- 2
AHUs on every floor
Air handling units are placed in dedicated rooms or corridors on every floor, connected to the chiller with isolated pipes.
- 3
Multiple chillers for very large hotels
Very large hotels with many floors may need several isolated and balanced chillers to keep even cooling throughout all floors.
Before the visit
Before our visit in Makkah
- 1
Provide architectural and mechanical drawings
Send the drawings before the visit to determine chiller size or number of chillers and vertical pipe routes.
- 2
Confirm roof, plant room and electrical capacity
Agree the roof, plant room and available three-phase power with the engineer, and confirm drainage capacity.
- 3
Arrange lifting in the dense site
Tell us how to access the roof and main entrance, and set lifting and installation dates considering other site activities.
Other services in Makkah
FAQ
Questions about Chiller & AHU installation
How is the chiller unit lifted to the roof?
The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.
Why do chilled water pipes need aluminium cladding?
Chilled water pipes carry cold water through air conditions that vary according to the building's own environment and its city's climate. Without external protection, insulation deteriorates and loses effectiveness. Aluminium cladding shields the insulation on rooftops and in internal spaces, preserving its performance over time.
Can you connect AHUs to an existing duct network?
Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.
What does system commissioning involve?
After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.
What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?
A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.
Do you install chillers in Makkah's massive hotels and residential towers?
Yes. We install chillers and AHUs in hotels, residential towers and service buildings in Makkah, and commission the system fully before pilgrim and visitor seasons.
How do chilled water pipes and chiller parts reach my site in Makkah from Jeddah?
We prepare the pipes, insulation and cladding to the approved design, and install the chiller and AHUs in Makkah to the schedule we agree in the quote.
Does Makkah's dry heat affect chiller performance?
The dry heat most of the year raises the chiller's load, so we size capacity based on expected pilgrim and visitor numbers and seasonal occupancy. Adequate ventilation around the outdoor unit is essential.
Where are the chiller and plant room placed in Makkah's massive hotel?
The chiller is mounted on the roof or in a plant room near the building core, and chilled water pipes run vertically between floors. The high building density requires coordination with other trades before ceilings and walls close.