Chiller & AHU installation in Riyadh, Riyadh Region

Chiller and AHU installation in Riyadh serves large buildings that need reliable central cooling. We are based in Jeddah: we install your units on the roof or in the plant room, commission the system and test it fully before handover.

4.9 on Google
  • Vibration isolation
  • Aluminium cladding
  • Full commissioning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When you need this installation

  1. 1

    A new commercial or government building

    The building is ready but the central cooling plant is not yet installed. You need a team to lift the chiller to the roof, prepare the bases and run chilled water pipework to AHUs on every floor.

  2. 2

    An existing unit vibrates and makes noise

    Constant vibration loosens pipe joints and fatigues mechanical components. If the unit is not sitting on proper vibration isolators, that is corrected during reinstallation; the site survey determines which isolator type is needed.

  3. 3

    Extending an existing building

    Adding floors or new areas means extra AHUs and extending the chilled water network. We connect the extension to the existing plant after verifying the current chiller capacity, which the site study determines.

Who it's for

  • Building a hospital or hotel that needs a central cooling plant

    We visit the site before the building is complete to plan pipe routes and the plant room, then lift the chiller, mount AHUs on every floor and commission the full system.

    Ask on WhatsApp
  • Replaced an old chiller but connections do not match

    We survey the new chiller and existing pipework, fabricate any transition pieces needed in our workshop, then reconnect and pressure-test the network before start-up.

    Ask on WhatsApp

What the job covers

What the installation covers

  • Chiller lifted onto isolated base
  • Chilled pipework run and insulated
  • Aluminium cladding of pipework
  • AHUs mounted and duct-connected
  • Pressure test and commissioning
Request a quote

How we work

How we work

  1. 1

    Site survey and design

    We visit the site to measure the plant room or roof, check pipe and duct routes, and determine lifting requirements and the right vibration isolator type for the building.

  2. 2

    Base preparation and lifting

    We prepare the chiller and AHU bases, fix the vibration isolators, lift the units into final position and check they are level before any connections are made.

  3. 3

    Pipework and ductwork

    We run the chilled water pipes, insulate them and clad them in aluminium sheet to keep the insulation effective according to the building's conditions and its city's climate, then connect each AHU to its duct network.

  4. 4

    Pressure test and commissioning

    We pressure-test the pipework to confirm there are no leaks, then run the full system, measure air conditions at each AHU and adjust dampers until the required air distribution is achieved.

Start with step one

Why Alrabih?

Considered installation or a rushed one?

AlrabihThe usual way
Chiller baseIsolators matched to the siteBolted straight to concrete
Pipe insulationFull insulation with aluminium claddingPartial or left bare
Pipe testPressure test before start-upStarted without testing
Air balancingMeasured and dampers adjustedUnbalanced airflow
Transition piecesFabricated in our own workshopImprovised or ill-fitting
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we have completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Where we work

Chiller & AHU installation in cities near Riyadh

We are based in Jeddah, and we supply duct and install across the Kingdom. All our services in Riyadh

What sets this city apart

Large Riyadh buildings include office towers, hotels, hospitals and massive residential compounds, all needing central chillers and air handling. The chiller is mounted on the roof or in a dedicated plant room with vibration isolation bases, and the chilled water pipes need thick insulation and aluminium cladding to withstand heat and dust. AHUs connect to the duct network on each floor, and commissioning checks water and air pressure and balances the distribution.

Riyadh is the Kingdom's capital on the Najd plateau, with a hot dry climate: fierce summer heat and dust, mild cool winters. Its large buildings serve varied purposes and range widely in size.

Air-cooled chillers on the roof with multi-floor air handling units are the standard setup in Riyadh's commercial and residential towers.

All our services in Riyadh

The AC setup in Riyadh

  1. 1

    Roof-mounted chiller with vibration isolation

    The chiller sits on the roof on isolation bases to reduce vibration and noise, and the chilled water pipes run through the building with thick insulation and aluminium cladding.

  2. 2

    AHUs with varying pipe runs to each floor

    Each floor has an AHU connected to the chiller through pipes of varying length, and the pressure and flow balance in each unit is tested during commissioning.

  3. 3

    Plant room with electrical and drainage runs

    The plant room must have three-phase power for the chiller and AHUs, and drainage for condensate pipes and maintenance water.

Before the visit

Before our visit in Riyadh

  1. 1

    Provide the mechanical and architectural drawings

    Send the drawings before we visit, so we can determine chiller size, the number of AHUs needed and the pipe routes.

  2. 2

    Confirm the plant room and roof location

    Agree the plant room and roof location with the site engineer and confirm the available electrical capacity.

  3. 3

    Arrange access for lifting equipment

    Tell us the roof access and main entrance for unloading the chiller, AHUs and pipes, and set the date for lifting and installation.

FAQ

Questions about Chiller & AHU installation

How is the chiller unit lifted to the roof?

The method depends on the chiller weight, the building height and the space available around the site. The survey determines whether a crane or other equipment is used, and we verify that the roof structure can carry the load before setting the unit on its base.

Why do chilled water pipes need aluminium cladding?

Chilled water pipes carry cold water through air conditions that vary according to the building's own environment and its city's climate. Without external protection, insulation deteriorates and loses effectiveness. Aluminium cladding shields the insulation on rooftops and in internal spaces, preserving its performance over time.

Can you connect AHUs to an existing duct network?

Yes, if the existing ducts are in good condition and match the new unit's connections. At the survey we check the duct opening sizes, the duct condition and the plenum arrangement, and confirm whether part of the network needs adjustment or transition pieces need to be fabricated in our workshop.

What does system commissioning involve?

After the pipe pressure test we run the chiller and AHUs, measuring air temperature and pressure at each unit's outlets. We adjust dampers and valves to achieve the designed air and water flow to every zone in the building, and record the final readings before handover.

What is the difference between placing the chiller on concrete inertia bases and on rubber anti-vibration mounts?

A concrete inertia base adds mass that dampens the chiller's own vibration and holds the unit steady when the compressor starts. Rubber anti-vibration mounts interrupt the path of vibration before it reaches the roof slab. Whether to use one approach or both depends on the site survey, which takes into account the roof structure, the size of the unit and the building design.

Do you install chillers in office buildings and hotels in Riyadh?

Yes. We install chillers and AHUs in all large Riyadh buildings including towers, hotels, hospitals and residential compounds, and commission the system before handover.

How do chilled water pipes and chiller parts reach my site in Riyadh from Jeddah?

We prepare the pipes, insulation and cladding in Riyadh following the design, and install the chiller and AHUs to the schedule we agree in the quote.

Does Riyadh's extreme heat affect the chiller's performance?

Extreme summer heat raises the chiller's load, so we select capacity based on the building's cooling calculations, and ensure adequate ventilation around the outdoor unit to maintain efficiency.

Where are the chiller and AHUs placed in large Riyadh buildings?

The chiller is mounted on the roof or in a plant room with electricity and drainage nearby, and AHUs are placed in plant rooms on each floor or on the roof, connected to the duct network.

Start with a site survey

WhatsApp us the building plan or site photos, or call to arrange a survey visit, Saturday to Thursday.

CallWhatsApp