Tower and office building HVAC in Al Aziziyah, Jeddah

In Al Aziziyah, central Jeddah, where office towers and large residential blocks stand side by side, cooling these buildings demands an advanced central system that distributes conditioned air from the plant room to every floor. Alrabih designs and installs the ductwork, plenum boxes and air outlets to ensure independent control for each tenant.

4.9 on Google
  • Zone control
  • Vertical risers
  • Per-floor zoning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When your building needs a specialist contractor

  1. 1

    New office tower under construction

    The hardest part is coordinating with the main contractor: fixing riser shafts and floor penetrations before concrete is poured, locating plant rooms on the right floors, and documenting everything before walls are closed.

  2. 2

    Existing building needing a system upgrade

    The old system no longer serves the current tenant load, energy losses are high, or some floors stay warm in Jeddah's humid heat with no one knowing where the fault starts. A detailed survey identifies the path forward.

  3. 3

    New tenant redesigning their floor

    Moving partition walls means relocating air outlets and dampers for every new office. A zone designed carefully lets you add the tenant without upsetting the air balance across the rest of the building.

Who it's for

  • Your office tower is under construction now

    We coordinate with the main contractor to fix riser shafts, floor penetrations and plant room positions before walls are closed and concrete is poured.

    Ask on WhatsApp
  • You manage an occupied office building with complaints

    We survey the existing network floor by floor, identify why airflow is unbalanced across zones, and carry out corrections in phases without cutting cooling to neighbouring offices.

    Ask on WhatsApp

What the job covers

What our scope covers

  • Duct network design
  • G90 sheet to SMACNA
  • Zone layout and dampers
  • Flexible connections and plenums
  • Commissioning and air balancing
Request a quote

How we work

How we work

  1. 1

    Survey and drawing review

    We visit the site and review the architectural and structural drawings, fixing riser routes, plant room positions and floor penetrations in coordination with the project team.

  2. 2

    Design and zone layout

    We design the duct network, assign zones per floor and tenant, and set duct sizes, damper positions and plenum box locations for every branch.

  3. 3

    Duct fabrication and installation

    We fabricate ducts in our workshop from G90 galvanized sheet to SMACNA standards, insulate them with glass-wool, and install floor by floor in coordination with other contractors on site.

  4. 4

    Balancing and handover

    After start-up we balance airflow across all air outlets, verify each thermostat responds correctly, and hand the as-built drawings to the building management.

Start with step one

Why Alrabih?

Integrated design or unplanned expansion?

AlrabihThe usual way
Zone layoutDesigned per floor and tenantEstimated without design
DuctworkFabricated to calculated sizesRandom sizes used
DampersOn every branch for controlFitted where convenient
As-built recordFinal drawings handed overNo record after handover
Riser insulationGlass-wool stops condensationInsulation skipped
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Towers and large blocks in Al Aziziyah require tight coordination between the contractor, designer and HVAC specialist, because ductwork runs through concrete walls and structural beams across multiple floors, and system commissioning begins before construction ends. The high humidity and salty coastal air demand robust components and installation that prevents air leakage and condensation inside the ducts.

Al Aziziyah is in central Jeddah's heart, a mixed district of office towers, large residential blocks, commercial shops and parking zones.

Most office towers and large blocks in Al Aziziyah use vertical air distribution from the plant room, with the main duct run in the building's central spine.

The AC setup in Al Aziziyah

  1. 1

    Central vertical duct in the building spine

    Large towers here use a unified vertical air shaft extending from the ground floor upward, then horizontal distribution of air on each level.

  2. 2

    Plenum boxes and dampers on each floor

    Each floor contains a smaller plenum box and control dampers to distribute air independently to each rental zone.

  3. 3

    Air outlets distributed regularly across the space

    Air outlets and diffusers are placed on ceilings at regular intervals to ensure even distribution of cool air through every office and corridor.

Before the visit

Before our visit in Al Aziziyah

  1. 1

    Obtain building plans and system diagrams

    Send us the architectural and mechanical plans before the visit so we can map ductwork runs and identify available spaces in the building.

  2. 2

    Confirm access to the plant room

    Check that the plant room is safe and accessible for our team, and the entrance allows equipment and ducts to enter without obstruction.

  3. 3

    Coordinate with building management and tenants

    Notify building management of installation and inspection dates, and prepare occupants on active floors for any temporary disruptions during work.

FAQ

Questions about Tower and office building HVAC

How does each tenant control their own temperature independently?

Each floor or zone is fed from its own plenum box, a damper controls the volume of air entering, and the thermostat sets the required temperature. This layout lets each tenant adjust their space without affecting the floors above or below.

Do tenant fit-out works affect cooling on other floors?

When the system is designed with independent zones, redistributing outlets or moving dampers inside one floor stays isolated from the rest of the building. We review the revised layout and rebalance that zone before the tenant moves in.

How does Jeddah's humidity affect duct design in towers?

High humidity means outdoor air carries a greater moisture load, which feeds into duct sizing and treated air volumes. Risers near the facade also need thorough glass-wool insulation to stop condensation forming on the duct surface inside the building.

Can you work while the building is occupied?

Yes, and that requires phasing the work floor by floor or wing by wing so cooling is never cut to neighbouring offices. We agree a programme with building management before starting and identify at the survey which sections can be isolated without disrupting daily operations.

How is cooling managed for the tower lobby and car park?

The lobby and car park have different requirements from office floors: ceiling heights differ, heat loads vary and ventilation needs change. The lobby needs diffusers suited to tall spaces, while the car park requires mechanical ventilation working alongside the cooling. The site survey determines the right design for each space.

How does each tenant control the temperature of their floor in an office tower?

Alrabih installs separate dampers and thermostats for each rental zone, allowing temperature adjustment without affecting other floors, while the unified duct remains under central system control.

The upper floors of a tower are hard to reach, how do you inspect the ductwork and outlets?

We coordinate maintenance and inspection schedules with building management and use safe, planned equipment to avoid disrupting tenants in occupied floors.

Does the high humidity near the sea affect the efficiency of the ductwork and outlets?

Yes, moisture condensation can collect inside the ducts if insulation and installation are not precise, which is why we use high-quality glass-wool insulation and check drainage regularly.

When does your team start installing the ductwork and outlets during construction?

We begin after the concrete structure and main beams are complete, coordinating with the contractor and engineer to avoid conflicts with other building trades.

The Jeddah corniche in cool weather

Start with a detailed building survey

Send us the building plan or a site photo on WhatsApp, or call us, and we will arrange the survey at your location, Saturday to Thursday, 8 am to 8 pm.

CallWhatsApp