Tower and office building HVAC in Al Faisaliyah, Jeddah

In Al Faisaliyah, central Jeddah, office tower HVAC relies on one central system that distributes chilled air from the plant room through vertical risers to every floor, letting each tenant control their zone independently. Alrabih designs these systems so each floor works on its own, unaffected by any tenant's fit-out changes.

4.9 on Google
  • Zone control
  • Vertical risers
  • Per-floor zoning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When your building needs a specialist contractor

  1. 1

    New office tower under construction

    The hardest part is coordinating with the main contractor: fixing riser shafts and floor penetrations before concrete is poured, locating plant rooms on the right floors, and documenting everything before walls are closed.

  2. 2

    Existing building needing a system upgrade

    The old system no longer serves the current tenant load, energy losses are high, or some floors stay warm in Jeddah's humid heat with no one knowing where the fault starts. A detailed survey identifies the path forward.

  3. 3

    New tenant redesigning their floor

    Moving partition walls means relocating air outlets and dampers for every new office. A zone designed carefully lets you add the tenant without upsetting the air balance across the rest of the building.

Who it's for

  • Your office tower is under construction now

    We coordinate with the main contractor to fix riser shafts, floor penetrations and plant room positions before walls are closed and concrete is poured.

    Ask on WhatsApp
  • You manage an occupied office building with complaints

    We survey the existing network floor by floor, identify why airflow is unbalanced across zones, and carry out corrections in phases without cutting cooling to neighbouring offices.

    Ask on WhatsApp

What the job covers

What our scope covers

  • Duct network design
  • G90 sheet to SMACNA
  • Zone layout and dampers
  • Flexible connections and plenums
  • Commissioning and air balancing
Request a quote

How we work

How we work

  1. 1

    Survey and drawing review

    We visit the site and review the architectural and structural drawings, fixing riser routes, plant room positions and floor penetrations in coordination with the project team.

  2. 2

    Design and zone layout

    We design the duct network, assign zones per floor and tenant, and set duct sizes, damper positions and plenum box locations for every branch.

  3. 3

    Duct fabrication and installation

    We fabricate ducts in our workshop from G90 galvanized sheet to SMACNA standards, insulate them with glass-wool, and install floor by floor in coordination with other contractors on site.

  4. 4

    Balancing and handover

    After start-up we balance airflow across all air outlets, verify each thermostat responds correctly, and hand the as-built drawings to the building management.

Start with step one

Why Alrabih?

Integrated design or unplanned expansion?

AlrabihThe usual way
Zone layoutDesigned per floor and tenantEstimated without design
DuctworkFabricated to calculated sizesRandom sizes used
DampersOn every branch for controlFitted where convenient
As-built recordFinal drawings handed overNo record after handover
Riser insulationGlass-wool stops condensationInsulation skipped
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we've completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop ductwork and an exhaust fan, with Jeddah buildings in the background.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Service areas

We come to you anywhere in Jeddah

From Al Shiraa and Al Yaqout in the north to Al Thaghr and Al Quraiyat in the south, with our base in Al Aziziyah.

Map of Jeddah by sector, with Alrabih's base in Al Aziziyah
Don't see your district?Message us. We most likely cover it.

What sets this district apart

Al Faisaliyah holds modern mid-rise office buildings and mixed-use residential towers that call for complex vertical duct runs and precise air distribution to ensure even cooling to all floors. Jeddah's high humidity and salty coastal air make it essential to use high-grade glass-wool insulation to protect the ducts from condensation, and to design drainage points so moisture does not pool in the vertical runs.

Al Faisaliyah sits in central Jeddah, mixing office, residential and hotel buildings across relatively open space.

Most office towers in Al Faisaliyah use a distribution system with horizontal ducts on each floor and central vertical stacks, with the plenum box in each floor's ceiling.

The AC setup in Al Faisaliyah

  1. 1

    Central plant room on the roof or ground floor

    Most Al Faisaliyah towers place the main chiller in an insulated plant room on the roof or basement, making routine maintenance easy and freeing up valuable commercial space.

  2. 2

    Central vertical stacks in the core of the building

    Vertical stacks typically run through the building's core beside electrical and drainage shafts, providing a stable, unified path to distribute air from bottom to top.

  3. 3

    Plenum box and dampers per floor

    Each floor has its own plenum box in the suspended ceiling and individual control dampers, letting you adjust pressure and flow on each level separately.

Before the visit

Before our visit in Al Faisaliyah

  1. 1

    Identify the plant room location and access

    Tell us where the plant room is and what space is available, and make sure our team can access it with their equipment without obstacles.

  2. 2

    Clarify the vertical stack layout and connection points

    Provide a building plan showing the vertical stack path and which floors it reaches, and mark the connection point on each floor.

  3. 3

    Coordinate with building management and tenants

    Notify building management and tenants of the visit time in advance, especially if the team needs access to floor ceilings or private areas.

FAQ

Questions about Tower and office building HVAC

How does each tenant control their own temperature independently?

Each floor or zone is fed from its own plenum box, a damper controls the volume of air entering, and the thermostat sets the required temperature. This layout lets each tenant adjust their space without affecting the floors above or below.

Do tenant fit-out works affect cooling on other floors?

When the system is designed with independent zones, redistributing outlets or moving dampers inside one floor stays isolated from the rest of the building. We review the revised layout and rebalance that zone before the tenant moves in.

How does Jeddah's humidity affect duct design in towers?

High humidity means outdoor air carries a greater moisture load, which feeds into duct sizing and treated air volumes. Risers near the facade also need thorough glass-wool insulation to stop condensation forming on the duct surface inside the building.

Can you work while the building is occupied?

Yes, and that requires phasing the work floor by floor or wing by wing so cooling is never cut to neighbouring offices. We agree a programme with building management before starting and identify at the survey which sections can be isolated without disrupting daily operations.

How is cooling managed for the tower lobby and car park?

The lobby and car park have different requirements from office floors: ceiling heights differ, heat loads vary and ventilation needs change. The lobby needs diffusers suited to tall spaces, while the car park requires mechanical ventilation working alongside the cooling. The site survey determines the right design for each space.

How do you ensure even air distribution across all floors of the tower?

We size the dampers on each floor to balance pressure and flow, and test each section after installation to confirm air reaches every zone evenly.

Can one tenant change the duct layout without affecting other floors?

Yes, we fit separate dampers and thermostats on each floor so other zones stay completely independent of any changes to one floor.

Jeddah's humidity causes condensation in ducts, how do you protect against it?

We wrap cold-air ducts with thick glass-wool insulation, and fit drainage points in the lower section of the vertical stacks to prevent moisture pooling.

What is the difference between hard ducts and flexible duct runs on a single floor?

Main ducts carry larger air volumes and pressure, while flexible ducts easily connect smaller outlets to the main run and fit tight spaces between walls.

The Jeddah corniche in cool weather

Start with a detailed building survey

Send us the building plan or a site photo on WhatsApp, or call us, and we will arrange the survey at your location, Saturday to Thursday, 8 am to 8 pm.

CallWhatsApp