University HVAC in Tabuk, Tabuk Region

University HVAC in Tabuk must handle lecture halls filling with students in the morning and emptying after classes, while keeping labs and storage rooms cool all day. We are based in Jeddah and design a hybrid system combining a central plant with units in each building, after studying your campus needs.

4.9 on Google
  • Hall fresh air
  • Zone control
  • Break scheduling

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

When the campus needs a specialist

  1. 1

    Halls whose loads change fast

    A lecture hall goes from empty to full in minutes and the heat load jumps suddenly. A system sized for a steady load cannot handle this swing, so the compressor labours or the air fails to reach the back rows.

  2. 2

    Many buildings and scattered systems

    A campus holds buildings with systems of different ages and types. Without coordination, energy use rises and maintenance becomes difficult. We assess what is there in the survey and propose the right solution building by building.

  3. 3

    Labs that need controlled air and pressure

    A lab needs enough fresh air to dilute fumes, and sometimes a pressure difference between it and the adjacent corridor. The right damper and a carefully designed plenum box are the basis of that control, and any error in them affects the safety of the space and the work done in it.

Who it's for

  • Building a new university block that needs HVAC design

    We design HVAC and ventilation for every hall and lab from scratch, supply ductwork and suitable equipment.

    Ask on WhatsApp
  • Existing HVAC systems failing to cool the lecture halls

    We survey each building, decide what to replace or repair, and complete all works during the term break.

    Ask on WhatsApp

What the job covers

What Alrabih's university work covers

  • Design per building
  • G90 duct to SMACNA
  • Dampers and plenum installation
  • Glass wool and Kingspan insulation
  • Thermostat setting per zone
Request a quote

How we work

How we work

  1. 1

    Campus survey

    We visit every building, note its area, existing system type, air openings and usage schedule, then set intervention priorities and timing before writing any specification.

  2. 2

    Design and specification

    We design the ductwork, dampers and plenum boxes for each building, select suitable equipment from our authorised brands, then present the plan to the university administration.

  3. 3

    Works during the break

    Major works such as replacing ductwork and fitting equipment are done in the inter-term break, scheduled with the university so each phase finishes before students return.

  4. 4

    Commissioning and handover

    We run each system, set the dampers and thermostat for every hall and lab, check that fresh air reaches the back of the halls, then hand the university's technical team the system documentation.

Start with step one

Why Alrabih?

Tailored design or one solution for all?

AlrabihThe usual way
Equipment sizingMatched to each building's loadSame size for every building
Fresh airCalculated for peak occupancyLeft to natural leakage
Hall controlThermostat per zoneOne switch for the building
Works timingScheduled in the term breakMid-term disruption
DuctworkWorkshop-fabricated to design dimensionsOff-the-shelf standard sizes
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we have completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Where we work

University HVAC in cities near Tabuk

We are based in Jeddah, and we supply duct and install across the Kingdom. All our services in Tabuk

What sets this city apart

Universities in Tabuk spread across large areas of the city and combine lecture halls, labs, libraries and administrative buildings. The long dry summer means duct and outdoor units need sun protection and heavy insulation. The cold winters call for a design that lets you reduce cooling gradually without abrupt shutdowns, and major maintenance happens in the long break between terms.

Tabuk is a north-west city on a desert plateau ringed by mountains, with hot dry summers and cold winters.

A typical university campus in Tabuk has a central system serving multiple buildings with a main duct, branches and concealed indoor units in each hall.

All our services in Tabuk

The AC setup in Tabuk

  1. 1

    Central system with main duct

    The Tabuk campus benefits from a single central system sending a main duct that branches to each building, providing unified control from one plantroom.

  2. 2

    Concealed units in each building

    Each campus building in Tabuk has concealed HVAC units above ceilings, connected to the main duct and delivering cool air to halls and offices.

  3. 3

    Outdoor units on building roofs

    Outdoor units are mounted on the various building roofs, with duct and copper reaching them via sun and dust-protected routes.

Before the visit

Before our visit in Tabuk

  1. 1

    Provide the campus and building plans

    Send the full campus plan and each building's floor plans before the visit, so we can estimate the main duct length, branches and indoor units in each structure.

  2. 2

    Confirm outdoor unit locations

    Agree with your campus engineer on fixed roofs or areas for outdoor unit placement on each building, as this decides the duct and copper lengths and balance between them.

  3. 3

    Plan major maintenance timing

    Arrange with your university that major servicing and cleaning happen in the inter-term break, so we do not disrupt classes during the academic year.

FAQ

Questions about University HVAC

How do you handle halls that fill and empty quickly?

We calculate the hall load at maximum occupancy and design the ductwork and plenum box to meet that peak, then fit controllable dampers so the system responds quickly to change. The right thermostat for each hall also helps hold a comfortable temperature when occupancy shifts suddenly.

How does local climate affect ventilation design?

Local climate has a direct effect on ventilation design. The fresh air entering large halls carries a latent load that varies with each city's climate. We calculate this load as part of the design based on the building's conditions and its city's climate, so the equipment performs correctly. Outdoor unit materials and coatings are selected according to what the site survey reveals.

Do you make the ductwork on site or in your workshop?

We fabricate ductwork in our own workshop from G90 galvanized sheet to the designed dimensions, and also supply flexible duct connecting the main duct to the air outlets. Workshop fabrication improves dimensional accuracy and reduces time spent on the campus site.

Do you work on existing buildings that need their HVAC updated?

Yes. Many university buildings run on ageing equipment or corroded ductwork. We start with a careful survey of each building to decide what stays and what is replaced, then plan the work by building priority and term break dates so studies are not affected. The type of replacement equipment is decided by the surveyor after the site inspection.

Does a lab need a different air system from a lecture hall?

Usually yes. A lab needs enough fresh air to dilute fumes, and may need a pressure difference between it and the corridor. We set the exact requirement at the site survey according to the lab type and use, then adjust the dampers and design the air system to hold it steadily.

Can you design a system that adapts to changing numbers of students in different halls?

Yes. We design a system that lets you run occupied halls while shutting down or easing back the others, and the duct is routed to make airflow control between buildings straightforward. We finalize this after reviewing the academic schedule and available halls.

How does the design and duct reach the campus from Jeddah to Tabuk?

We send you the design and drawings before starting, fabricate the duct in our workshop to the approved sizes, supply it to the campus in Tabuk and install it with our team. Dates and handover are agreed in the quote.

Do Tabuk's dry heat and cold winters change which units and insulation you choose?

The hot dry summer demands tight insulation wherever duct crosses roofs or unconditioned spaces, and the cold winters influence which unit and controls suit the real load. We survey the site and buildings when we arrive to choose the right units and insulation.

When should HVAC systems be installed in new campus buildings during construction?

Duct and pipes go in before ceilings close, after the structure and main electrical runs are complete, and outdoor units are mounted on roofs once construction finishes. We coordinate the timing with the site engineer before starting.

Start with a campus survey

Contact us on WhatsApp or by phone to arrange a survey of your buildings, Saturday to Thursday, 8 am to 8 pm.

CallWhatsApp