Central AC installation in Riyadh, Riyadh Region

Central AC installation in Riyadh starts with a heat load calculation for your villa or building and ends with handover of the complete working system. We design it, choose the units and duct from our own workshop, supply copper, install, test and commission everything under one contract from our Jeddah base.

4.9 on Google
  • Design and build
  • Own-workshop ducts
  • Full commissioning

Clients We're Proud to Serve

Organisations and companies that trusted Alrabih with their projects.

  • Saudi Aramco
  • Ministry of Energy
  • Royal Saudi Land Forces
  • Royal Saudi Naval Forces
  • Al Baik
  • Centro Hotels by Rotana
  • King Abdullah Economic City
  • First Mills
  • Juffali
  • eXtra
  • Dr. Soliman Fakeeh Medical Center
  • Alesayi Motors
  • Abu Zaid
  • Water Desalination
  • Attieh Steel
  • SSCO
  • Creet
  • Emad Rizq
  • Alfaneyah
  • Rawat Alam Al Tasmeem
  • IBI Magix Arabia, Construction Services
  • Midtown for Construction
  • Petra Engineering Industries Co.
  • Hyrmas
  • Batterjee Medical College
  • Advanced Horizons Contracting Company
  • D.Metals
  • Benchbox, Masters of Space
  • Sadafco
  • Umm Al-Qura University
  • Saudi Arabian Drug Store (SADS)
  • Foamco
  • Ahmad A. R. Bin Afif Industries Co. (Sandwich Panel Factory)
  • Namariq
  • ALS

Is it for you?

Who needs a complete central system?

  1. 1

    A new villa before finishing

    The finishing stage is the right time to run central AC ducts before the ceilings close. Delaying the decision means extra cost later or compromises in the duct route that weaken airflow in certain rooms.

  2. 2

    A commercial or office building

    A commercial building needs airflow that fits how the floors are divided and how the load varies between levels. The site survey sets unit count, duct routes and outlet positions before any decision is made.

  3. 3

    An old system draining power

    Old units, deteriorating ducts and leaking copper push the electricity bill up without cooling the space properly. Replacing the whole system starts with a fresh load calculation, not with larger units pushed into the same old ductwork.

Who it's for

  • Building a villa and need ducts before ceilings close

    We visit during the finishing stage, design duct routes and outlet positions, fabricate the ducts in our workshop and install them before the ceilings close, so you take over a fully working villa.

    Ask on WhatsApp
  • Managing a commercial building and replacing an old system

    We recalculate the loads, design airflow to match the current floor layout and replace both units and ductwork completely so the system runs reliably without repeated faults.

    Ask on WhatsApp

What the job covers

What the contract covers

  • Load calc and system design
  • Units from authorised distributors
  • Duct fabrication and fitting
  • Insulated Mueller copper runs
  • Full commissioning and handover
Request a quote

How we work

How we work

  1. 1

    Survey and load calculation

    The engineer visits, measures each zone, and calculates the thermal load per area, accounting for facade orientation, ceiling height, intended use, and the building's conditions and its city's climate.

  2. 2

    Design and unit selection

    We draw duct routes and outlet positions and select units from Carrier, YORK, General, Midea, Gree or Smart Gold, then present the design to you before any work begins.

  3. 3

    Fabrication and installation

    Round and rectangular ducts are fabricated in our workshop from G90 galvanised sheet to SMACNA standards, then installed on site alongside the copper runs, insulation and electrical connections.

  4. 4

    Commissioning and handover

    We pressure-test the copper lines, vacuum them, check air balance at every outlet and condensate drain fall, then hand the system over to you in full working order.

Start with step one

Why Alrabih?

One contractor or several parties?

AlrabihThe usual way
Design and buildOne party accountableDesigner and installer split
DuctsOur workshop, G90 standardUnmonitored outside suppliers
CopperUp to 30 m, weld-freeUnknown source, many joints
CommissioningPressure test, vacuum, air balanceStraight power-on, no testing
InsulationArmaflex and Kimmco fittedPatchy or missing
Request a quote

Everything your AC needs, from one team

From system design and duct fabrication to installation, commissioning and maintenance.

Some of our work

Ductwork, rooftop units and diffusers, from work we have completed.

  • Galvanized rectangular duct trunk with branch takeoffs and round diffusers, hung from a black ceiling, a Carrier unit visible behind — interior finishing stage.
  • Round diffusers and a spiral duct trunk in a tiled stairwell service shaft.
  • Rooftop packaged AC units with rectangular duct transitions, city buildings behind.
  • Insulated rooftop duct run beside a packaged unit, a warehouse roof in the background.
  • A grid of round diffusers in an open-plan office ceiling, mid-construction.
  • An insulated rooftop duct elbow, against a mountainous backdrop.
  • Large insulated ductwork running along a factory ceiling, with workers visible below.
  • A yellow round diffuser mid-installation, with spiral duct and a suspended ceiling grid.
  • Duct insulation wrap in progress on a construction site, bare duct still exposed.
  • A black-painted duct trunk with round diffusers and track lighting, in a finished retail interior.
  • An indoor AHU unit connected to round ductwork in a mechanical plant room, exposed concrete ceiling.
Browse all our work Similar project? Send us the details

Customer reviews

What our customers say

4.9

From 21 Google reviews

  • Waleed Daadouch

    “The nicest treatment from the showroom team, and their prices are very competitive.”

    Translated from Arabic

  • Muhammadramzan 2641

    “MashaaAllah. Services are so good. Behaviour and kindness 100/100. Prices are less then Market. Fully recommended”

  • RHAM rhamLocal Guide

    “May God grant them success. Refined and respectful treatment.”

    Translated from Arabic

  • shahzeb armani

    “Wow. Prices are so comfortable. Outstanding services. People are so talented and nice”

  • Shakeel Ahmed

    “Nice experience very cooperative. Nice conducting with all customers”

  • Tawfik AlyawerLocal Guide

    “U can find all u need for air conditioning”

Read every review on Google

Your satisfaction matters to us! If you had a great experience with us, we'd love a 5-star rating and a kind review.

Worked with us? Leave a review

Where we work

Central AC installation in cities near Riyadh

We are based in Jeddah, and we supply duct and install across the Kingdom. All our services in Riyadh

What sets this city apart

The spacious villas, compounds and office and commercial buildings in Riyadh need powerful and precise central air conditioning. In a villa we typically install a horizontal concealed unit above the false ceiling and an outdoor unit on the roof, with insulated duct in unconditioned spaces. Larger buildings need a design that splits the load across several units and balances pressure and airflow across multiple floors.

Riyadh, the Kingdom's capital on the Najd plateau, has a hot dry climate with scorching summers and is built largely of large villas and residential and office towers.

In most Riyadh villas the indoor unit needs strong insulation because the duct crosses unconditioned spaces before reaching the false ceilings.

All our services in Riyadh

The AC setup in Riyadh

  1. 1

    Horizontal concealed unit with rooftop placement

    In villas the indoor unit is mounted above the false ceiling and the outdoor unit sits on the roof, with insulated duct connecting through the spaces between.

  2. 2

    Multi-unit system for large buildings

    Large office and residential buildings need several indoor units distributed across floors or wings, fed by one main duct with dampers controlling the distribution.

  3. 3

    Heavy insulation for exposed duct

    Duct and copper crossing roofs and unconditioned spaces receive thick insulation to protect them from the extreme summer heat.

Before the visit

Before our visit in Riyadh

  1. 1

    Provide architectural and site drawings

    Send the foundation, floor and roof plans before the visit, so we can pinpoint unit and duct locations and calculate the heat load accurately.

  2. 2

    Clarify which areas are and are not conditioned

    Make clear which spaces you want air-conditioned and which you do not, as this affects the system and duct size.

  3. 3

    Coordinate unit positions with the site contractor

    Agree the indoor and outdoor unit locations with the site contractor before ceilings and walls start, and tell us the plan.

FAQ

Questions about Central AC installation

How do you decide the right unit size for my villa?

We calculate the thermal load for each zone based on its area, ceiling height, number of external openings, orientation and intended use, taking into account the building's conditions and its city's climate. We choose the unit size after this calculation, not before.

Do you make the ducts yourselves or buy them ready-made?

We fabricate round and rectangular ducts in our own workshop from G90 galvanised sheet or aluminium sheet depending on what the project needs. This lets us cut ducts to the exact site dimensions and fit them tightly, avoiding ill-fitting sections that leak air and raise electricity consumption.

What if the copper run to an outdoor unit is very long?

We supply copper runs of up to 30 metres without welded joints. If a run exceeds that, the survey determines whether the outdoor unit position needs rethinking or whether the refrigerant charge needs adjustment according to the type shown on the unit's nameplate.

Can each floor of the villa run on its own?

Yes, and it is settled at the design stage. Each floor can have its own unit, or the network can be split into zones with dampers and a thermostat in each, so you do not cool the whole upper floor while the family sits in the majlis. We recommend the right option after the load calculation.

Do the outdoor units need a special base on the roof?

Yes, and the roof surface determines what kind of base is needed. For villas we fabricate a raised steel frame that keeps the unit clear of pooled rainwater and allows airflow beneath it. The exact height and angle depend on the roof pitch and the condensate drain position, which the site survey establishes. The aim is to keep the unit level and to prevent vibration movement during operation.

What is the difference between a concealed ducted unit and a split unit in a Riyadh villa?

A concealed ducted unit distributes cold air through ducts to multiple rooms from one hidden unit above the ceiling, maintaining the look and comfort. A split unit sits on a wall and cools only one room or zone.

How does the central AC system you design and install reach my Riyadh villa from Jeddah?

We calculate the heat load and design the system to your villa's drawings, fabricate the duct in our workshop, deliver the units and materials to your Riyadh site, install everything, test it and hand over. The schedule is agreed in the quote.

Does Riyadh's extreme summer heat affect the performance of central air conditioning?

Extreme heat increases the system's load, so we choose units with sufficient capacity and insulate the duct and pipes thoroughly where they cross roofs and exposed areas, so the air arrives cold in every room.

Do I need to coordinate with the site engineer before installing central AC in a villa under construction?

Yes. The indoor and outdoor unit positions, duct route and copper runs must be set with the engineer before ceilings and walls close, otherwise changes mean opening and rebuilding.

Start with a site survey

WhatsApp a brief description of the villa or building and your district, or call us Saturday to Thursday between eight in the morning and eight in the evening to arrange a survey visit.

CallWhatsApp